BIAYA PRODUKSI ALAT MUAT DAN ALAT ANGKUT PADA KEGIATAN PENGUPASAN OVERBURDEN PENAMBANGAN BATUBARA DI PT. KARBINDO ABESYAPRADHI

Toni Mayyondra (Universitas Negeri Padang)
Murad Murad (Universitas Negeri Padang)
Fadhilah Fadhilah (Universitas Negeri Padang)



Article Info

Publish Date
12 Sep 2015

Abstract

PT. Karbindo Abesyapradhi is one of the coal mines located in West Sumatera province Sijunjung. In mining PT. Karbindo Abesyapradhi in cooperation with PT. Pasura Bina Mine as a sub contractor who is a subsidiary of Srikandi Group.Based on observations in stripping overburden at PT. Karbindo Abesyapradhi, it was found that the production activities of overburden is not optimal. This is caused by equipment that works on the field non optimal when used, which is visible from the unloading tool is waiting on the field.Actually total unloading production is 104,910 BCM/month, and conveyances 84,590 BCM/month, it caused not achieving the target production of overburden that has been planned not reached. After analysis it is found that the cause of low production work efficiency is low and lack of transport in use. By increasing the efficiency of work and made additional conveyance, then obtained a total production of 131,090 BCM tool loading / month and conveyance 123,436 BCM/month.From the results of the calculation, the cost of production and the means of conveyance and unloading tool to strip overburden before it is analyzed is Rp.2,511,980,033/month or Rp.29,696/BCM, and having analyzed the cost of production tools and conveyances fit into Rp.3,022,347,665/month or Rp.24,485/BCM, so to strip the overburden in accordance with the planned production target required fee of Rp.2,938,200,000 

Copyrights © 2015






Journal Info

Abbrev

mining

Publisher

Subject

Earth & Planetary Sciences

Description

Atas dukungan dari jurusan Teknik Pertambangan dengan Penanggung Jawab Dekan Fakultas Teknik UNP (Drs. Ganefri,MPd, P.hd) bekerjasama dengan Ketua Jurusan Teknik Pertambangan (Drs.Bambang Heriyadi,MT) dan seluruh Dosen Jurusan Teknik Pertambangan Fakultas Teknik Universitas Negeri Padang. Jurnal ini ...