PENGENDALIAN PELAKSANAAN PROYEK DITINJAU DARI SEGI WAKTU PADA GEDUNG RRC DI PROYEK REKONTRUKSI DAN PENINGKATAN UNP

Nasrul Nasrul (Institut Teknologi Padang)
Rosi Maida Astuti (Institut Teknologi Padang)



Article Info

Publish Date
02 Jun 2020

Abstract

To monitor and control the timing of the project needs to use one method that meets these goals is a network (network planning) concept of the value of the results ( earned value concept) in the form of a schedule of integrated (schedule variance ), which consists of three indicators , namely BCWS , BCWP , and ACWP , Research procedure begins with a feasibility study case , collecting data , and analyzing the results from the available data.

Copyrights © 2020






Journal Info

Abbrev

RANGTEKNIKJOURNAL

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Computer Science & IT Electrical & Electronics Engineering Engineering

Description

RANG TEKNIK JOURNAL, merupakan Jurnal Penelitian dan Kajian Ilmiah yang diterbitkan Fakultas Teknik Universitas Muhammadiyah Sumatera Barat yang terbit 2 (dua) kali dalam ...