PENGENDALIAN PELAKSANAAN PROYEK DITINJAU DARI SEGI WAKTU PADA GEDUNG RRC DI PROYEK REKONTRUKSI DAN PENINGKATAN UNP Nasrul Nasrul; Rosi Maida Astuti
Rang Teknik Journal Vol 3, No 2 (2020): Vol. 3 No. 2 Juni 2020
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (122.368 KB) | DOI: 10.31869/rtj.v3i2.1938

Abstract

To monitor and control the timing of the project needs to use one method that meets these goals is a network (network planning) concept of the value of the results ( earned value concept) in the form of a schedule of integrated (schedule variance ), which consists of three indicators , namely BCWS , BCWP , and ACWP , Research procedure begins with a feasibility study case , collecting data , and analyzing the results from the available data.