Teknika: Jurnal Sains dan Teknologi
Vol 16, No 1 (2020): Edisi Juni 2020

Studi penempatan Circuit Breaker Outgoing (CBO) dan perhitungan relay pada Penyulang Puma berdasarkan pembacaan arus maksimal di Gardu Induk PLN New Bintaro

Agusutrisno Agusutrisno (Universitas Sultan Ageng Tirtayasa)
Wahyu Prabowo (PT PLN)
Bayu Bagoes Wicaksono (Universitas Sultan Ageng Tirtayasa)



Article Info

Publish Date
11 Jun 2020

Abstract

Dalam penyaluran listrik seringkali mengalami gangguan atau arus hubung singkat yang disebabkan oleh banyak hal. Dari arus gangguan hubung singkat tersebut akan berdampak pada penurunan kualitas peralatan listrik yang ada di gardu induk maupun gardu distribusi. Untuk itu diperlukannya studi proteksi untuk mengamankan atau melindungi dari gangguan tersebut. Telah berhasil dilakukan studi tentang tentang optimalisasi fungsi circuit breaker outgoing (CBO) sebagai sistem perlindungan pada Penyulang Puma Gardu Induk New Bintaro PLN. Metode yang digunakan adalah metode perhitungan berdasarkan data yang bersumber dari spesifikasi Gardu Induk New Bintaro PLN. Berdasarkan hasil perhitungan arus gangguan hubung singkat, maka CBO harus ditempatkan yaitu 50 % dari panjang Penyulang Puma. Hasil perhitungan pada OCR didapat arus setting primer 157,5 A, nilai konstanta setting 0,143, dan waktu kerja relay 0,297 detik. Sedangkan perhitungan pada ground fault relay (GFR) didapat arus setting primer 41, 506 A, nilai konstanta setting 0,136 dan waktu kerja relay 0,273 detik. Sehingga waktu yang dibutuhkan CBO untuk memutus arus gangguan hubung singkat sangat cepat yaitu untuk arus gangguan hubung singkat 3 phasa sebesar 0,297 detik dan arus gangguan hubung singkat 1 phasa sebesar 0,273 detik. In the distribution of electricity often experience interference or short circuit current caused by many things. The short-circuit fault current will have an impact on the decline in the quality of electrical equipment in substations and distribution substations. For this reason, protection studies are needed to secure or minimize these disturbances. A successful study has been carried out on optimizing the role of circuit breaker outgoing (CBO) as a protection system for the New PLN Bintaro Substations. The method used is a calculation method based on data sourced from PLN New Bintaro Substations. Based on the calculation of the short circuit fault current, then the CBO must be placed at 50% of the length of the puma feeder. The calculation results obtained on the OCR primary setting current 157.5 A, the value of the constant setting 0.143, and the working time of the relay 0.297 seconds. For the calculation on the ground fault relay (GFR), the primary setting current is 41, 506 A, the value of the setting constant is 0.136 and the relay working time is 0.273 seconds. So the time needed for CBO to break the short circuit fault current is very fast, namely for the 3 phase short circuit fault current of 0.297 seconds and the 1 phase short circuit fault current of 0.273 seconds.

Copyrights © 2020






Journal Info

Abbrev

ju-tek

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Civil Engineering, Building, Construction & Architecture Electrical & Electronics Engineering Engineering Industrial & Manufacturing Engineering

Description

Teknika: Jurnal Sains dan Teknologi merupakan jurnal peer-reviewed dalam Bahasa Indonesia di bidang keteknikan, diantaranya bidang teknik sipil, bidang teknik mesin, bidang teknik industri, bidang teknik kimia, bidang teknik metalurgi, dan bidang teknik ...