Optimasi Pemakaian Sendiri PLTU dengan Metode Audit Energi pada Motor Listrik 3 Fasa di PLTU X

Rio Afrianda (Institut Teknologi PLN)
Samsurizal Samsurizal (Institut Teknologi PLN)



Article Info

Publish Date
22 Dec 2020

Abstract

PLTU X is an industrial power plant with a large consumption of electrical energy for its own use. In ISO50001, every industry with a large Energy Consumption Intensity (IKE) needs to be audited for energy consumption. The company performance contract also regulates that the percentage of own use should not exceed 6% of electricity production. Currently, the percentage of own use in PLTU X unit 5 is greater than unit 4. For this reason, it is necessary to conduct an energy audit for own use with the aim of reducing the percentage of own use in unit 5 by 0.5% from current conditions and finding opportunities for energy savings at PLTU X unit 5. To analyze this problem using the energy audit method, analysis using the performance test method using the "gate cycle" and testing the quality of the voltage source by measuring using power quality analysis. After finding the equipment with the greatest energy consumption, fish bone tools were used to find the main cause of this abnormality.

Copyrights © 2020






Journal Info

Abbrev

jis

Publisher

Subject

Education

Description

SETRUM : Sistem Kendali Tenaga Elektronika Telekomunikasi Komputer merupakan jurnal yang diterbitkan oleh Jurusan Teknik Elektro, Fakultas Teknik, Universitas Sultan Ageng Tirtayasa (UNTIRTA) sejak 2012 menggunakan sistem Open Journal System ...