Lowland Technology International
Vol 19 No 2, Sep (2017)

Settlement-time curve calculation of soil-cement column and slab improved soft clay deposit

S. Pongsivasathit (Unknown)
P. Voottipruex (Unknown)
J.C. Chai (Unknown)



Article Info

Publish Date
04 Mar 2017

Abstract

The consolidation behavior of soft clayey deposit improved by a floating soil-column with a cement stabilized slab on the ground surface has been investigated by laboratory model test using a symmetric unite cell model and finite element analysis (FEA). The effects of thickness and undrained shear strength of slab on the relative penetration of column into surrounding soil were quantified. Based on the results, the method proposed Pongsivasathit et al. for calculating the settlement of a floating column improved soft subsoil has been modified. The main modification is the equation for calculating the value of Hc, which is the thickness of a soil layer at the bottom of the column improved zone. And in settlement calculation, Hc layer has been treated as an unimproved layer. The effectiveness of proposed method has been verified by comparing with the measurement results of field case histories and laboratory model tests.

Copyrights © 2017






Journal Info

Abbrev

ialt_lti

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Transportation

Description

The Lowland Technology International Journal presents activity and research developments in Geotechnical Engineering, Water Resources Engineering, Structural Engineering, Transportation Engineering, Urban Planning, Coastal Engineering, Disaster Prevention and Mitigation ...