Jurnal Infrastruktur
Vol 7 No 1 (2021): Jurnal Infrastruktur

COST PLANNING BANGUNAN GEDUNG SEDERHANA DENGAN COST SIGNIFICANT MODEL DI KABUPATEN HULU SUNGAI SELATAN (Studi Kasus Proyek PKM di Hulu Sungai Selatan)

Candra Yuliana (Program Studi Teknik Sipil Fakultas Teknik Universitas Lambung Mangkurat)
Aulia Isramaulana (Program Studi Teknik Sipil Fakultas Teknik Universitas Lambung Mangkurat)
M. Dzulfi Khairiannoor (Program Studi Teknik Sipil Fakultas Teknik Universitas Lambung Mangkurat)



Article Info

Publish Date
26 Apr 2021

Abstract

Project cost estimates must be prepared before the project is implemented. The Cost Significant Model is a model of estimating total construction costs, based on past construction data using the Pareto Principle. The purpose of this research is to apply the method of cost significant models to a building project to determine the initial cost of a building project. The estimated cost per m2 model is Y = 11,564 (X3) + 2949750.72, where X3 is the cost per m2 of foundation, sloof, and floor work. The accuracy of the Cost Significant Model ranges from -9.4% to 4.8%. This estimation model is feasible to be used to check the estimated offer.

Copyrights © 2021






Journal Info

Abbrev

infrastruktur

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Transportation

Description

Jurnal Infrastruktur merupakan jurnal yang dikelola oleh Program Studi Teknik Sipil Universitas Pancasila dengan nomor ISSN 2476-9339 dan E-ISSN 2540-9212 Jurnal Infrastruktur diterbitkan secara berkala 2 (dua) kali dalam 1 (satu) tahun, yaitu pada bulan April dan Oktober. Fokus dan ruang lingkup ...