ANALYSIS OF FACTORS CAUSE DELAY PROJECT CONSTRUCTION BRIDGE IN THE CITY OF BANJARMASIN Isramaulanan, Aulia; Yuliana, Candra; Hasbullah, Hasbullah
TROPICAL WETLAND JOURNAL Vol 3, No 3 (2017)
Publisher : The Journal is published by Graduate Programe of Lambung Mangkurat University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

With an area of 98.46 km2 whose territory is separated by rivers, to increase economic growth Banjarmasin City has done infrastructure development in the field of transportation of roads and bridges are quite significant. But in the process of implementation, there is often a delay in the bridge construction project. This can lead to problems within the scope of the project itself. So it is necessary to do further research to know the cause of the bridge construction project delay. This research is conducted qualitatively and quantitatively. The causative factors obtained from the literature were distributed to contractors through questionnaires to see perceptions of contractors and concessions. The data of the questionnaire were analyzed by using validity test, reliability, and descriptive statistical analysis with Pearson Moment (Bivariate Pearson) method assisted by ms. excel to get the factors causing the delay. Then the delay factors will be tested through interviews with stakeholders in the three bridge samples. Based on the results of data processing analysis, it can be concluded that the factors that greatly affect the bridge construction project delays are analyzed by descriptive analysis of material arrival delay, material arrival delay, damage due to negligence of work, and work that does not comply with operational standards
NALYSIS OF FACTORS CAUSE DELAY PROJECT CONSTRUCTION BRIDGE IN THE CITY OF BANJARMASIN Aulia Isramaulanan; Candra Yuliana; Hasbullah Hasbullah
TROPICAL WETLAND JOURNAL Vol 3 No 3 (2017): Tropical Wetland Journal
Publisher : Postgraduate Program - Lambung Mangkurat University (ULM Press Academic)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/twj.v3i3.55

Abstract

With an area of 98.46 km2 whose territory is separated by rivers, to increase economic growth Banjarmasin City has done infrastructure development in the field of transportation of roads and bridges are quite significant. But in the process of implementation, there is often a delay in the bridge construction project. This can lead to problems within the scope of the project itself. So it is necessary to do further research to know the cause of the bridge construction project delay. This research is conducted qualitatively and quantitatively. The causative factors obtained from the literature were distributed to contractors through questionnaires to see perceptions of contractors and concessions. The data of the questionnaire were analyzed by using validity test, reliability, and descriptive statistical analysis with Pearson Moment (Bivariate Pearson) method assisted by ms. excel to get the factors causing the delay. Then the delay factors will be tested through interviews with stakeholders in the three bridge samples. Based on the results of data processing analysis, it can be concluded that the factors that greatly affect the bridge construction project delays are analyzed by descriptive analysis of material arrival delay, material arrival delay, damage due to negligence of work, and work that does not comply with operational standards.
COST PLANNING BANGUNAN GEDUNG SEDERHANA DENGAN COST SIGNIFICANT MODEL DI KABUPATEN HULU SUNGAI SELATAN (Studi Kasus Proyek PKM di Hulu Sungai Selatan) Candra Yuliana; Aulia Isramaulana; M. Dzulfi Khairiannoor
Jurnal Infrastruktur Vol 7 No 1 (2021): Jurnal Infrastruktur
Publisher : Jurnal Infrastruktur

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35814/infrastruktur.v7i1.1290

Abstract

Project cost estimates must be prepared before the project is implemented. The Cost Significant Model is a model of estimating total construction costs, based on past construction data using the Pareto Principle. The purpose of this research is to apply the method of cost significant models to a building project to determine the initial cost of a building project. The estimated cost per m2 model is Y = 11,564 (X3) + 2949750.72, where X3 is the cost per m2 of foundation, sloof, and floor work. The accuracy of the Cost Significant Model ranges from -9.4% to 4.8%. This estimation model is feasible to be used to check the estimated offer.
PERUBAHAN TERJADINYA PUNCAK PASANG SURUT SUNGAI BARITO AKIBAT PEMANASAN GLOBAL Holdani Kurdi; Ulfa Fitriati; M. Ainun Najib; Aulia Isramaulana
INFO-TEKNIK Vol 20, No 1 (2019): INFOTEKNIK VOL. 20 NO. 1 JULI 2019
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/infotek.v20i1.6960

Abstract

Regional development engineering in coastal areas, tidal land reclamation, delta area reclamation and port planning, tidal knowledge is very important. Tides mainly occur due to the gravitational forces of the moon, sun, and other planets. The influence of different gravitational forces can be predicted precisely because the rotation and revolutionary movements of the earth, moon, sun, and other planets take place with very high order. The tidal period every day is mainly determined by the rotation of the earth with a 24-hour period. Influence of the sun even though its attraction is only half that of the lunar pull, its influence should not be ignored As understood months around the earth with a period of about 29.5 days. When the position of the moon-earth-sun is in line, the tidal forces of the sun and moon strengthen each other. At that time spring tide occurred. Whereas if the sun-earth forms an angle of 90 degrees, then the minimum tides occur (neap tide). The two conditions are about 7 days old, according to the moon's revolution. Because of the influence of the inertia of the mass of water, the spring and neap tide occur between one and three days after these extreme conditions occur. In short-term studies often researchers take extreme conditions, namely during the tidal peak and peak tide (spring tide), because it does not require a long time compared to researching during a longer tide period. The research approach that will be carried out is whether the tide and peak peaks still occur 1-3 days after the full moon and the dead moon, whether there is a change in the height of the tide and ebb during a certain period due to global warming. As a result of global warming, it is also an effect on the water level of the Barito River. There was a decrease in the maximum water level which previously was around 3 m, now only around 2 m, the minimum water level previously around 2 m was now below 1 m. This will affect the hydrotopographic conditions of tidal swamp land, land that was previously type A can change to type B and so on. The highest tides on the Barito River often occur in the dead months, namely the 1st and 29th of the Hijri.
PRODUKTIVITAS ALAT BERAT DAN BIAYA PELAKSANAAN PEKERJAAN PADA PROYEK PEMELIHARAAN BERKALA RUAS JALAN: SUNGAI LAKUM – PASAR KAMIS (KERTAK HANYAR) Aulia Isramaulana; Rizka Norjanah
INFO-TEKNIK Vol 21, No 1 (2020): INFOTEKNIK VOL. 21 NO. 1 JULI 2020
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/infotek.v21i1.8967

Abstract

On the project Periodic Maintenance of Road Sungai Lakum Pasar Kamis is a project implemented using heavy equipment. By using heavy equipment, will facilitate and accelerate the course of the project. The tools used must be considered maintenance, because it is very influential on the production tools and costs incurred for the use of the tool. This study aims to analyze the use of heavy equipment in the periodic Maintenance Project of road Sungai Lakum Pasar Kamis by using theoretical analysis based on field data. Analyzing the calculation is the productivity and cost of the equipment on the scope of work that is the work of the land, widening work and road shoulder work, grinding pavement work, and asphalt work, using Excel program as a tool in data processing so that the achievement of the use of heavy equipment available in finish the job. Based on the calculation obtained the price of theoretical analysis unit based on field data for the work of preferred stockpiles from the source of Rp. 310.994.714,2; Class B aggregate base layer Rp. 76.127.086,04; Aggregate base layer with hill excavation Rp. 59.705.050,39; Class A base aggregate layer Rp. 204.703.029,9; Asphalt lining resap coat liquid Rp. 3.038.436,28; Lataston coating foundation Rp. 306.997.682,6. Where the calculation of unit price based on field data is smaller than the unit price of the bid data.
RENCANA ANGGARAN BIAYA UNTUK SUMUR RESAPAN MASJID BESAR KOTA BANJARBARU Aulia Isramaulana
INFO-TEKNIK Vol 15, No 2 (2014): INFOTEKNIK VOL. 15 NO. 2 2014
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/infotek.v15i2.226

Abstract

Banjarbaru is one of the cities in South Borneo, which has developed very rapidly in line with the growth of population and the physical building. This has implications for the decreasing availability of water catchment areas. Therefore it is necessary to built recharge wells to avoid a puddle of water on the surface. This study aimed to quantify the discharge of rain and water for ablution, plan dimensions and the number of recharge wells and budget plans for a large mosque in Banjarbaru.The infiltration wells design using Sunjoto formula. To determine the coefficient of permeability of the soil, tested in the field by using a double ring infiltrometer and testing in the laboratory by using Constant Head Test. This Tests on three major mosques in Banjarbaru , the first is Al-Munawaroh Mosque, Jami Hidayatul Muhajirin Mosque, and Al-Baythar Mosque.The result is Al-Munawaroh Mosque designed infiltration wells depth of 5 m at a cost of one unit of infiltration wells Rp. 4,842,900.00, whereas for Hidayatul Muhajirin Mosque Al-Baythar Mosque designed depth of 3 m at a cost of one unit of infiltration wells Rp. 3,406,700.00. Keywords: infiltration wells, budget plan, Banjarbaru Mosque
The Study of Clean Water Demand in Palangka Raya City, Central Kalimantan Ulfa Fitriati; Aulia Isramaulana; Achyat Yulianto Adi Saputro
Journal of Wetlands Environmental Management Vol 9, No 2 (2021): July-December, 2021
Publisher : Center for Journal Management and Publication

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (730.823 KB) | DOI: 10.20527/jwem.v9i2.254

Abstract

Palangka Raya as the capital city of Central Kalimantan become the center lane economy leading to increase population growth and clean water demand. There are still areas experiencing water shortage problems because of the difficulty of distributing clean water.  Objectives of this study were to determine the amount of water demand in 2016, 2020, 2025, 2030 and 2035 to fulfill the community requirements. Water quality and supply capacity at the intake system are also be the purposes of this study.In this study, the calculation of population projections using statistical methods in which to observe the rate of population growth of the past to estimate the number of people in the future. There are several methods that can be used to analyze the population growth in the future, specifically Arithmetic, Geometric, Linear Regression, Exponential, and Logarithmic. For water quality field survey was conducted to test parameters such as temperature, electrical conductivity, the amount of dissolved solids, pH, turbidity, salinity, and dissolved oxygen measurements. The method in this research was using Arithmetic method because the correlation can be said to be excellent compared to other methods. Results of this research were clean water demand discharge town of Palangka Raya with consecutive results as follows in 2016; 2020; 2025; 2030; 2035 amounted to 451.03 L/sec, 737.14 L/sec, 1,162.34 L/sec, 1,425.83 L/sec, 1,571.12 L/sec. In the aspect of water quality, source of raw water used PDAM Palangka Raya unqualified the standards in terms of pH value, so the use of water was not safe for the residents of Palangka Raya city.