Lowland Technology International
Vol 23 No 2 (2021): Lowland Technology International Journal

Analysis Study Proportion of Labour Wages on Road Development Project in Indonesia

Rosmariani Arifuddin (Unknown)



Article Info

Publish Date
15 Sep 2021

Abstract

In a construction project, determining the amount of costproportion to the resource should be precise. This researchaims to analyze the proportion of labor wages, identifying therelationship between labor wage costs to contract value andmodel the proportion of these resources so that they can beused as a reference. The research variables consist of workerswage costs (X1), the artisan's wage cost (X2), and the cost ofthe wage (X3), each determined by the proportion of the valueof the project. From the results of data collection, the proportionof the use of cost for workers is 0.27%-4.34%, the cost of thehandyman is 0.1%-1.07% and the cost for the foremanamounted to 0.1%-3.91%. Based on a simple regressionanalysis the most influential variable on the contract value isthe cost of worker’s wages with a value of R2 of 12.3%. Theresult of a regression analysis indicates that any increase inlabor cost variables will be followed by increased contractvalue. From the results of the analysis, produced amathematical model of Y = 0274 X1 + 0079 X2 + 0097 X3

Copyrights © 2021






Journal Info

Abbrev

ialt_lti

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Transportation

Description

The Lowland Technology International Journal presents activity and research developments in Geotechnical Engineering, Water Resources Engineering, Structural Engineering, Transportation Engineering, Urban Planning, Coastal Engineering, Disaster Prevention and Mitigation ...