Journal of Earth and Marine Technology (JEMT)
Vol 1, No 2 (2021)

Laterite Nickel Mine Sequence Modeling Based on Total Reserve at Block 5A, “Bonus” Pit by Surpac 6.3.2 at PT Bintang Delapan Mineral in Bahodopi District, Morowali Regency, Central Sulawesi

Harsalim Aimunandar Jayaputra (Politeknik Negeri Malang)



Article Info

Publish Date
31 Mar 2021

Abstract

PT. Bintang Delapan Mineral is an active nickel mine company that produces 300,000 tons of nickel per month by open pit method. During the mine operation, the company needs to calculate the reserves periodically due to decreasing nickel reserves in the long time period. Mineral reserves estimation is a process to determine and define the grade and boundary of a mineral deposit. Reserves estimation can be done manually using several methods. One method is called block modeling which presents the estimation process in block model type by applying a mining software, called Surpac 6.3.2. It was able to present the progress of mine site activity (pushback). The result of nickel reserves estimation by Surpac 6.3.2 block modeling is 48730 m3 or equal to 73096 tons. The nickel reserves have an average grade of 1.64%. By this reserve estimation, mine sequences could be created into 7 sequences in considering bench height. Bench model specifications are bench high 4 m, berm 2 m, and 60º slope.

Copyrights © 2021






Journal Info

Abbrev

jemt

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Earth & Planetary Sciences Energy Physics Transportation

Description

Earth Science and planetary, Geology, Geochemistry, Geophysics, Geodesy, Geomatics, Geotech, Rock mechanics, Mining engineering, Natural Disaster, Land and ocean development, Natural resources, Environmental science, Social impact of mining and marine activity, Science and technology in mapping and ...