Abstract: Factors that often happens when held CCO (Contract Change Order) Is the repeated coordination with owner related work to be done. The highest mean value of the variable is the performance indicator quantity is 3.87 and the lowest on indicators of punctuality that is equal to 3.71, these results indicate that Change orders on bridge rehabilitation work Ngablak caused by the inaccuracy of the time. CCO (Contract Change Order) affect the performance of contractors by 67.4%, so it can be concluded that done CCO (Contract Change Order) is then the contractor does experience a decrease in performance Abstrak: Faktor yang sering terjadi ketika diadakan CCO (Contract Change Order) adalah terjadinya koordinasi yang berulang-ulang dengan owner terkait pekerjaan yang harus diselesaikan. Nilai mean tertinggi pada variabel kinerja adalah pada indikator kuantitas yaitu sebesar 3,87 dan yang terendah pada indikator ketepatan waktu yaitu sebesar 3,71, hasil tersebut menunjukkan bahwa Change order pada pekerjaan rehabilitasi Jembatan Ngablak disebabkan oleh ketidaktepatan waktu. CCO (Contract Change Order) berpengaruh terhadap kinerja kontraktor sebesar 67,4% sehingga dapat disimpulkan bahwa dilakukan CCO (Contract Change Order) ini maka kontraktor mengalami penurunan kinerja.
Copyrights © 2019