Yekti Condro Winursito (Department of Industrial Engineering, Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya 60294, Indonesia)
Handoyo (Department of Industrial Engineering, Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya 60294, Indonesia)
Iriani (Department of Industrial Engineering, Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya 60294, Indonesia)
Dwi Sukma Donoriyanto (Department of Industrial Engineering, Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya 60294, Indonesia)
Irma Dian (Department of Industrial Engineering, Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya 60294, Indonesia)
Mega Cattleya Prameswari Annissaa Islami (Department of Industrial Engineering, Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya 60294, Indonesia)
Rizky Setiawan (Department of Industrial Engineering, Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya 60294, Indonesia)



Article Info

Publish Date
16 Nov 2021

Abstract

Project management is a process of activities to manage organizational resources owned by the company to achieve certain goals. The Terbangi Besar-Kayu Agung Lampung toll road construction project is a project that must be completed in a short time. This study has a purpose to evaluate the performance of the construction project of the Terbangi Besar-Kayu Agung Lampung toll road using the PERT and CPM methods with a toll road length of 189.2 km (117.6 miles). Based on the results obtained by using these two methods, the project completion time which was originally 238 days can be completed in just 119. There are several alternative proposals. The alternative proposal by adding work shifts that have crashed 32 times has an optimal cost of IDR 39,154,229,627.03 and an optimal time of 119 days. While the alternative of increasing the capacity of the equipment produces an optimal time of 189 days and an optimal cost of IDR 39,205,747,076.44 with the crashing process reaching 12 times of crashing. The Toll Road Development Project Planning is scheduled to have a normal time to work for 238 days at a total cost of IDR 39,349,097,164.38.

Copyrights © 0000






Journal Info

Abbrev

nuscientech

Publisher

Subject

Agriculture, Biological Sciences & Forestry Chemical Engineering, Chemistry & Bioengineering Economics, Econometrics & Finance Engineering Law, Crime, Criminology & Criminal Justice Materials Science & Nanotechnology Medicine & Pharmacology

Description

NST Proceeding supports regional research communities to globalise their findings in Science and Technology by providing an open access, online platform in line with international publishing standards and indexing scholarly conference proceedings. The current emphasis of the NST Proceeding includes ...