Journal of International Conference Proceedings
Vol 2, No 1 (2019): Proceedings of the 3rd International Conference of Project Management (ICPM) Bal

The Development of 4D BIM Based Infrastructure Construction Time Planning Standard Operating Procedure to Enhance Communication Quality from Infrastructure Contractor Perspective

Almadani Jayadi (University of Indonesia)
Leni Sagita Riantini (University of Indonesia)



Article Info

Publish Date
27 Apr 2019

Abstract

4D BIM can be utilized as a visual communication media that simulates construction process, including infrastructure projects, to all stakeholders. One of its benefits is to enhance communication quality that can positively affect infrastructure construction time planning phase, which was one of the most important aspect in contractor’s business process. This research used qualitative method through interviews and expert validation to identify main activities in construction time planning phase, 4D BIM role in those activities, and involved stakeholders. As a result, 4D BIM based construction time planning strategy in the form of standard operating procedure and communication flow was developed to be used as guideline references for BIM implementation in Indonesia.

Copyrights © 2019






Journal Info

Abbrev

JICP

Publisher

Subject

Humanities Decision Sciences, Operations Research & Management Electrical & Electronics Engineering Industrial & Manufacturing Engineering Languange, Linguistic, Communication & Media

Description

JICP is proceedings series that aims to publish proceedings from conferences, in the fields of economics, business, and management research. All proceedings in this website are open access, which means the published articles are permanently free to read, download, copy, and distribute. The online ...