Claim Missing Document
Check
Articles

Found 1 Documents
Search

The Development of 4D BIM Based Infrastructure Construction Time Planning Standard Operating Procedure to Enhance Communication Quality from Infrastructure Contractor Perspective Almadani Jayadi; Leni Sagita Riantini
Journal of International Conference Proceedings (JICP) Vol 2, No 1 (2019): Proceedings of the 3rd International Conference of Project Management (ICPM) Bal
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (231.047 KB) | DOI: 10.32535/jicp.v2i1.393

Abstract

4D BIM can be utilized as a visual communication media that simulates construction process, including infrastructure projects, to all stakeholders. One of its benefits is to enhance communication quality that can positively affect infrastructure construction time planning phase, which was one of the most important aspect in contractor’s business process. This research used qualitative method through interviews and expert validation to identify main activities in construction time planning phase, 4D BIM role in those activities, and involved stakeholders. As a result, 4D BIM based construction time planning strategy in the form of standard operating procedure and communication flow was developed to be used as guideline references for BIM implementation in Indonesia.