JURNAL TEKNIK INDUSTRI
Vol. 2 No. 2 (2012): Volume 2 No 2 Juli 2012

PERBANDINGAN PENGUKURAN WAKTU BAKU DENGAN METODE STOPWATCH TIME STUDY DAN METODE READY WORK FACTOR (RWF) PADA DEPARTEMEN HAND INSERT PT. SHARP INDONESIA

Nataya Charoonsri Rizani (Unknown)
Dian Mardi Safitri (Unknown)
Prita Ayu Wulandari (Unknown)



Article Info

Publish Date
20 Jul 2012

Abstract

Production target of Department Hand Inserts PT Sharp Indonesia which was often not achieved, making the company intended to know the cause of the problem. Time study was needed to set production targets against operator’s ability. Time study established by the holding company of Japan using ready work factors (RWF) method. To determine conformity RWF method, a comparison with stopwatch time study was conducted. There were differences in the value of standard time with both methods. The differences due to value of rating operator performance and allowance. The value in RWF method was smaller than the findings in the field. After a change of both value the difference between the two methods became smaller. After that with standard time from RWF method was calculated operator's ability to produce. The results indicated that the ability of the operator under the production target, so improvement was needed.

Copyrights © 2012






Journal Info

Abbrev

tekin

Publisher

Subject

Electrical & Electronics Engineering Energy Industrial & Manufacturing Engineering

Description

Jurnal Teknik Industri (JTI) mainly focuses on industrial engineering scientific essays in the form of research results, surveys and literature review that are closely related to the Field of Industrial ...