ANALISA CRITICAL PATH METHOD (CPM ) PADA PROYEK PEMBANGUNAN CEKDAM PAKET 2 – KOTA PADANG

Taufik Kurnaini (Program Studi Teknik Sipil Fakultas Teknik Dan Perencanaan Universitas Ekasakti)
Helny Lalan (Program Studi Teknik Sipil Fakultas Teknik Dan Perencanaan Universitas Ekasakti)
M Adli (Program Studi Teknik Sipil Fakultas Teknik Dan Perencanaan Universitas Ekasakti)



Article Info

Publish Date
15 Jul 2022

Abstract

Time control is part of project management which also plays an important role in the quality of the implementation of a job. But in reality perfect implementation is very difficult to realize. Sometimes in project implementation there is often a delay in project completion time which results in swelling of project implementation costs. So that the biggest loss and problem is the termination of the contract. It takes a method in project control. Critical Path Method (CPM) can be used in controlling project execution time to minimize deviations in project implementation.   The objectives of this thesis include: 1). To know the critical path of work and to calculate the length of time for project implementation using the CPM (Critical Path Method). The results of the analysis there are several activities that are in the critical path. From the results of calculations and rescheduling, the total duration is 165 days, while the duration of the contract 195 days. The activity is completed 30 days earlier.Keywords: Project Management, Cost, Time, Critical Path Method.

Copyrights © 2022






Journal Info

Abbrev

education

Publisher

Subject

Education Languange, Linguistic, Communication & Media

Description

Jurnal yang menerbitkan artikel di bidang ilmu pendidikan di Indonesiam baik dalam bahasa Indonesia ataupn bahasa PBB. Jurnal terbit selama 3 kali dalam satu tahun, yaitu di Bulan April, Agustus, Desember. ...