Jurnal Manajemen Bisnis Transportasi dan Logistik
Vol 4, No 1 (2017): September

HUBUNGAN KETERSEDIAAN SUKU CADANG MESIN DENGAN KELANCARAN OPERASIONAL MT GEDE PADA PT PERTAMINA JAKARTA

Endang Sugiharti (Institut Transportasi Dan Logistik Trisakti)
Agus Prayikno (Institut Transportasi Dan Logistik Trisakti)
Dian Christoper (Institut Transportasi Dan Logistik Trisakti)



Article Info

Publish Date
29 Sep 2017

Abstract

Machine’s spare parts are very  important to support maintenance and repair ship’s machine. The purpose of this research is to find out the spare parts availability for ship’s machine and the level of smooth-running operation, and also to analyze the relationship between spare parts’ availability for machine and the level of smooth-running operation of MT. Gede of  PT Pertamina (Persero) Jakarta in 2017. To solve the problem, the writer used field research method and library research for collecting data, and data analysis technique used  Likert scale. Based on  the result, this research shows that  Simple Linear Regression Analysis obtains Ŷ = 8,068 + 0,837X which means every increase in spare parts’ availability for machine that is 1 unit of SKU (stock-keeping unit) will increase the level of smooth-running operation of MT. Gede about 0,837 point for PT Pertamina (Persero) Jakarta with 8,068 constant. A correlation coefficient obtained r XY = 0,740 which means the spare parts’ availability for machine has strong relationship between the level of smooth-running operation and PT Pertamina (Persero) Jakarta, because value of r = 0,740 means there is a positive and strong correlation between variable X (the spare parts’ availability for machine) and variable Y (the smooth-running operation of MT. Gede) that can be seen on interpretation of correlation table in Chapter I. The determinant coefficient is Kp = 54,7% which means relationship of contribution of the spare parts availability for machine is about 54,7% and the rest is about 45,3% for other factors outside the variable of this research, such as relationship of tools quality, skill of the ship’s crew, and other obstacle. The hypotesis testing obtained is  tcount (5,816 > 1,701) so Ho is rejected and Ha is accepted. It means that there is a significant relation between variable X (the spare parts’ availability for machine) and variable Y (the smooth-running operation of MT. Gede) so the hypotesis stated in Chapter 1 is absolutely true.

Copyrights © 2017






Journal Info

Abbrev

jmbtl

Publisher

Subject

Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Environmental Science Social Sciences Transportation

Description

The Journal of Transportation and Logistics Business Management is published by the Fakultas Manajamen dan Bisnis Institut Transportasi dan Logistik Trisakti as a scientific responsibility and the embodiment of the "Tridharma" of higher education. The scope of the article includes: Digital Service ...