Bulletin of Information Technology (BIT)
Vol 3 No 4: Desember 2022

Estimasi Pengembangan Perangkat Lunak Dengan Use Case Size Point

Puguh Jayadi (Universitas PGRI Madiun)
Juwari (Universitas PGRI Madiun)
Muh.Nur Luthfi Azis (Universitas PGRI Madiun)
Kelik Sussolaikah (Universitas PGRI Madiun)



Article Info

Publish Date
26 Dec 2022

Abstract

In software development activities one of the stages that need to be known by the project manager and the client is the estimated effort. The estimation activity is used as a reference in determining the time and personnel involved in software development. There are several methods used in software estimation such as Function Point, COCOMO, and Use Case Point. However, there are still some shortcomings such as the subjective tendency to measure complexity and lack of calculation on technical factors and environmental factors. The estimation used in this study uses the Use Case Size Point method which is the development of the Use Case Point method. The results of the Use Case size Point were used to provide a more accurate evaluation of effort with 0.01 Mean Magnitude of Relative Error (MMRE) and 0.01 Mean Magnitude of Relative Error (MMER)

Copyrights © 2022






Journal Info

Abbrev

BIT

Publisher

Subject

Computer Science & IT

Description

Jurnal Bulletin of Information Technology (BIT) memuat tentang artikel hasil penelitian dan kajian konseptual bidang teknik informatika, ilmu komputer dan sistem informasi. Topik utama yang diterbitkan mencakup:berisi kajian ilmiah informatika tentang : Sistem Pendukung Keputusan Sistem Pakar Sistem ...