eProceedings of Engineering
Vol 6, No 2 (2019): Agustus 2019

Analisis Beban Kerja Fisik Dan Perancangan Kebutuhan Jumlah Pegawai Menggunakan Metode Work Sampling Pada Divisi Human Resource Department Di Pt Pikiran Rakyat Bandung

Intan Novhela (Telkom University)
Christanto Triwibisono (Telkom University)
Fida Nirmala Nugraha (Telkom University)



Article Info

Publish Date
01 Aug 2019

Abstract

Abstrak - Analisis beban kerja dapat menjadi dasar sebuah perusahaan untuk menentukan jumlah pekerja ideal dalam perusahaan, apakah sudah cukup, harus ditambah atau dikurangi ketika terjadi peningkatan produksi, strukturisasi perusahaan, dan ketika perusahaan melakukan perubahan terhadap strategi bisnisnya. Hasil analisis beban kerja menggunakan metoda work sampling pada divisi Human Resource Development di PT Pikiran Rakyat Bandung diketahui bahwa urutan beban kerja dari yang tertinggi ke terendah yaitu : grup E dengan nilai beban kerja 144,2% (kategori beban kerja tinggi) - grup B dengan nilai beban kerja 136,3% (kategori beban kerja tinggi) - grup C dengan nilai beban kerja 107,1% (kategori beban kerja tinggi) - grup F dengan nilai beban kerja 102,2% (kategori beban kerja optimal) - grup A memiliki nilai beban kerja 97,8% (kategori beban kerja optimal) - dan nilai beban kerja terendah pada grup D yaitu 89,4% (kategori beban kerja optimal). Jumlah pegawai HRD PT Pikiran Rakyat saat ini adalah 12 orang. Berdasarkan hasil perhitungan beban kerja terhadap masing-masing grup, didapatkan bahwa dibutuhkan 2 pegawai tambahan yaitu 1 pegawai pada grup E dan 1 pegawai pada grup B, dan untuk grup A,C,D,F terhitung sudah memiliki jumlah pegawai yang sesuai dengan beban kerjanya. Kata kunci : beban kerja, work sampling, kebutuhan pegawai Abstract - Workload analysis can be the basis of a company to determine the number of ideal workers in the company, whether it is sufficient, must be added or reduced when there is an increase in production, structuring the company, and when the company changes its business strategy. The results of workload analysis using the work sampling method in the Human Resource Development division of PT Pikiran Rakyat Bandung note that the order of workload from highest to lowest is: group E with a workload of 144.2% (high workload category) - group B with the value of workload is 136.3% (high workload category) - group C with workload value of 107.1% (high workload category) - group F with workload value of 102.2% (optimal workload category) - group A has a workload value of 97.8% (optimal workload category) - and the lowest workload value in group D is 89.4% (optimal workload category). The number of HR employees at PT Pikiran Rakyat is currently 12 people. Based on the calculation of workload for each group, it was found that 2 additional employees were needed, namely 1 employee in group E and 1 employee in group B, and for group A, C, D, F was calculated to have the number of employees according to his workload . Keywords : workload, work sampling, employee need

Copyrights © 2019






Journal Info

Abbrev

engineering

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Engineering Industrial & Manufacturing Engineering

Description

Merupakan media publikasi karya ilmiah lulusan Universitas Telkom yang berisi tentang kajian teknik. Karya Tulis ilmiah yang diunggah akan melalui prosedur pemeriksaan (reviewer) dan approval pembimbing ...