Journal of Empowerment and Community Service
Vol. 1 No. 01 (2021): November

Diskusi Penyusunan RPJMDES Dalam Mewujudkan Desa Tanggap Bencana (Studi Kasus Desa Paku)

Jamaluddin (Universitas Lambung Mangkurat, Fakultas Ilmu Sosial dan Ilmu Politik, Banjarmasin, Indonesia)
Muhammad Muthahari Ramadhani (Universitas Lambung Mangkurat, Fakultas Ilmu Sosial dan Ilmu Politik, Banjarmasin, Indonesia)
Muhammad Ridho Fauzi (Mahasiswa Program Studi Ilmu Pemerintahan, Universitas Lambung Mangkurat, Fakultas Ilmu Sosial dan Ilmu Politik,Banjarmasin, Indonesia)
Refina Damayanti Hutagalung (Mahasiswa Program Studi Ilmu Pemerintahan, Universitas Lambung Mangkurat, Fakultas Ilmu Sosial dan Ilmu Politik,Banjarmasin, Indonesia)
Ati (Mahasiswa Program Studi Ilmu Pemerintahan, Universitas Lambung Mangkurat, Fakultas Ilmu Sosial dan Ilmu Politik,Banjarmasin, Indonesia)
Muhammad Riswan Yustiwandi (Mahasiswa Program Studi Ilmu Pemerintahan, Universitas Lambung Mangkurat, Fakultas Ilmu Sosial dan Ilmu Politik,Banjarmasin, Indonesia)
Hayatun Nisa (Mahasiswa Program Studi Ilmu Pemerintahan, Universitas Lambung Mangkurat, Fakultas Ilmu Sosial dan Ilmu Politik,Banjarmasin, Indonesia)
Kurniawan Hidayat (Mahasiswa Program Studi Ilmu Pemerintahan, Universitas Lambung Mangkurat, Fakultas Ilmu Sosial dan Ilmu Politik,Banjarmasin, Indonesia)
Tri Utomo Putra (Mahasiswa Program Studi Ilmu Pemerintahan, Universitas Lambung Mangkurat, Fakultas Ilmu Sosial dan Ilmu Politik,Banjarmasin, Indonesia)



Article Info

Publish Date
30 Nov 2021

Abstract

In development planning, a village must have a plan that can be used as a reference in implementing the development of a village, both in terms of physical and non-physical development. In accordance with Article 4 of Permendagri No. 114/2014, village development plans are prepared in a time-framed manner including: Village Medium-Term Development Plans (RPJM Desa) for a period of 6 years; and the Village Annual Development Plan or the so-called Village Government Work Plan (RKP Desa), is an elaboration of the Village RPJM for a period of 1 (one) year and is stipulated by village regulations. The method used in the preparation of the Paku Village Medium-Term Development Plan to realize a disaster-responsive village is the method of discussion or exchanging ideas between village officials. The initial stage of preparation in the preparation of the Village RPJM to be able to realize a disaster-responsive nail village. The discussion stage for the preparation of the RPJMDes of Paku Village was carried out at the Paku Village Head's Office and assisted by the Head of the RPJMDes Preparation Team, namely Mr. Kusnadiansyah and the Paku Village Head discussing the disaster response village.

Copyrights © 2021






Journal Info

Abbrev

jecsr

Publisher

Subject

Religion Agriculture, Biological Sciences & Forestry Computer Science & IT Economics, Econometrics & Finance Education Law, Crime, Criminology & Criminal Justice Public Health Social Sciences

Description

Journal of Empowerment and Community Service (JECSR) with EISSN 2808-179X published by Wadah Inovasi Indonesia (WII), was published in January, June, and November. With Articles written in English and Bahasa Indonesia, kindly for the author that is interested to register and submit the ...