Dalam pembangunan infrastruktur diperlukan manajemen konstruksi sebagai cara agar proyek berjalan dan mencapai hasil waktu, biaya, dan mutu yang terbaik. Penulisan studi ini bertujuan untuk menganalisa percepatan proyek pengembangan jaringan distribusi dan sambungan rumah (SR) Desa Warungdowo Kecamatan Pohjentrek Kabupaten Pasuruan Provinsi Jawa Timur menggunakan Microsoft Project Manager 2016. Data didapat akan digunakan untuk perhitungan perbandingan dua alternatif analisis yang berbeda yaitu penambahan jam kerja dan penambahan alat berat dalam optimalisasi pengerjaan proyek. Setelah analisis dilakukan didapatkan percepatan alternatif Pembangunan infrastruktur proyek pengembangan jaringan distribusi dan sambungan rumah (SR) Desa Warungdowo Kecamatan Pohjentrek Kabupaten Pasuruan Provinsi Jawa Timur, didapatkan hasil metode yang dapat mempercepat waktu serta meminimalisir biaya adalah alternatif penambahan jam kerja. Dari durasi awal pengerjaan proyek selama 150 hari turun 16% sehinga menjadi 126 hari, dengan penurunan biaya sebesar 1,84%. In infrastructure development, construction management is needed as a way for projects to run and achieve the best time, cost, and quality results. The writing of this study aims to analyze the acceleration of the project to develop a distribution network and house connection (SR) Warungdowo Village, Pohjentrek District, Pasuruan Regency, East Java Province, using Microsoft Project Manager 2016. The data obtained will be used for comparative calculations of two different alternative analyses, namely the addition of working hours and the addition of heavy equipment in optimizing project work. After the analysis was carried out, an alternative acceleration was obtained for the development of infrastructure for the distribution network development and house connection (SR) project Warungdowo Village, Pohjentrek District, Pasuruan Regency, East Java Province, the results of methods that can speed up time and minimize costs are alternatives to increasing working hours. From the initial duration of project work for 150 days decreased by 16% to 126 days, with a cost decrease of 1.84%.
Copyrights © 2023