cover
Contact Name
Achmad Riyanto
Contact Email
ariyanto@ub.ac.id
Phone
+62341-562454
Journal Mail Official
jtresda@ub.ac.id
Editorial Address
Jl. MT. Haryono No.167, Ketawanggede, Kec. Lowokwaru, Kota Malang, Jawa Timur 65145
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Teknologi dan Rekayasa Sumber Daya Air
Published by Universitas Brawijaya
ISSN : 27982386     EISSN : 27983420     DOI : https://doi.org/10.21776/ub.jtresda
Jurnal Teknologi dan Rekayasa Sumber Daya Air is a scientific journal published regularly twice per year by Water Resources Engineering Department, Universitas Brawijaya. The paper submitted in this journal covers the fields of Water Resources Information System, Water Resources Conservation, Water Resources Utilization and Efficiency, Water Structure Engineering Planning and Water Resources Engineering Basic Knowledge. The submitted paper can be a summary of research reports or scientific literature review. The language used in this journal is either English or Indonesian.
Articles 557 Documents
Studi Evaluasi Pengerukan Sedimen Pada Central Sediment Sump di Lokasi Penambangan Emas PT. Bumi Suksesindo Kabupaten Banyuwangi Yana Cunanda; Runi Asmaranto; Prima Hadi Wicaksono
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.01

Abstract

Central Sediment Sump is the largest sedimentation pond in the gold mine of PT. Bumi Suksesindo. Central Sediment Sump accommodates sediment from region Central Waste Dump (CWD), Pit E, and Pit B West. There is an increases in ore production began in 2018 makes the mining rate up to 8,1 million tons/year. This result increased sediment rates that are accommodated by Central Sediment Sump. The evaluation in this study is based on the amount of dredged sediment volume during 2018 with the volume of sediment that has been accommodated in the Central Sediment Sump. The volume of sediment that came from erosion in the Central Sediment Sump catchment area will be accommodated in the Central Sediment Sump. Dredged sediment volume depends on the bucket size excavators, excavator cycle times, and excavator work times. Excavator work time concern with the time needed to move the sediment volume that is already determined. The results evaluation of dredging sediment will describe sufficient whether or not sediment dredging in 2018 to dredge the sediment accommodated in Central Sediment Sump. Based on the results of this study the volume of sediment accommodates in Central Sediment Sump is 2.004.551,730 m3. Dredged sediment volume during 2018 is 11.755,310 m3. Therefore dredging sediment in 2018 insufficient to dredge all the sediment accommodates in Central Sediment Sump. Central Sediment Sump merupakan kolam pengendapan sedimen terbesar di Penambangan Emas  PT. Bumi Suksesindo. Central Sediment Sump menampung sedimen dari kawasan Central Waste Dump (CWD), Pit E, dan Pit B West. Adanya peningkatan produksi bijih mulai tahun 2018 menjadikan laju penambangan hingga 8,1 juta ton/tahun. Peningkatan ini mengakibatkan meningkatnya laju sedimen yang ditampung Central Sediment Sump. Evaluasi yang dilakukan pada studi ini berdasarkan pada jumlah volume sedimen terkeruk  selama tahun 2018 terhadap volume sedimen yang tertangkap di Central Sediment Sump. Volume sedimen yang berasal dari hasil erosi di daerah tangkapan air Central Sediment Sump akan tertangkap di Central Sediment Sump. Volume sedimen terkeruk tergantung pada ukuran bucket excavator, waktu siklus excavator, dan waktu kerja excavator. Waktu kerja excavator menggambarkan waktu yang diperlukan untuk memindahkan volume sedimen yang sudah ditentukan. Hasil evaluasi pengerukan sedimen akan menggambarkan cukup atau tidaknya pengerukan sedimen tahun 2018 untuk mengeruk sedimen yang tertangkap di Central Sediment Sump. Berdasarkan hasil studi ini diperoleh volume sedimen yang tertangkap di Central Sediment Sump sebesar 2.004.551,730 m3. Volume sedimen terkeruk selama tahun 2018 sebesar 11.755,310 m3. Sehingga pengerukan sedimen tahun 2018 tidak mencukupi untuk mengeruk seluruh volume sedimen yang tertangkap di Central Sediment Sump.
Perbandingan Metode FJ. Mock dan NRECA untuk Transformasi Hujan Menjadi Debit pada DAS Metro Kabupaten Malang, Jawa Timur karunia waasiu widyaningsih; Donny Harisuseno; Widandi Soetopo
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.05

Abstract

A process of converting rain data to runoff or discharge flow is called the rain transformation process. The transformation of rain into discharge is affected by the physical characteristics of the watershed and its land used. Discharge data in a watershed functions is as a measure of the amount of discharge available in a river which is useful in improving the management of water resources. This study purpose is to determine the results of the calculation of rain to discharge which located in the Metro DAS, Malang Regency. The methods analyzed by researchers is the FJ. Mock and NRECA methods. The results of the calculation from these methods are then compared with the rain data, because the AWLR discharge in the Sub Metro Watershed is considered not suitable to be the discharge of observations in this study. Based on the analysis results, the most suitable method for calculating the rainfall discharge in the Sub Metro Watershed is NRECA method with a determination coefficient (R2) = 0.792, and a correlation coefficient (r) = 0.887.  
Perencanaan Instalasi Pengolahan Air Limbah (IPAL) Cair Peternakan Sapi Pada Desa Petungsewu Kecamatan Dau Kabupaten Malang Bagas Kusdiyatno Wardana; Riyanto Haribowo; Emma Yuliani
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.02

Abstract

Di Malang raya khususnya Kabupaten Malang, belum terdapat satu pun Instalasi Pengolahan Air Limbah (IPAL) yang secara spesifik mengolah limbah cair peternakan. Maka dari itu penelitian ini bertujuan untuk mencari model IPAL yang paling efektif untuk mengolah limbah cair peternakan sapi. Berlokasi di Desa Petungsewu, sebuah peternakan dengan sapi berjumlah 14 ekor. Limbah cair yang dihasilkan mencapai 1,071 m3/hari. Kualitas air limbah menggunakan parameter yang mengacu ke Peraturan Menteri Lingkungan Hidup (Permen. LHK) Nomor 11 Tahun 2009 yakni BOD, COD, TSS, NH3-N, dan pH. Setelah uji laboratorium, masing-masing nilainya sebesar 64,27 mg/l; 201,4 mg/l; 100,1 mg/l; 66,02 mg/l; dan 8,35. Berdasarkan data kuantitas dan kualitas air limbah di atas, dilakukan pendekatan metode IPAL menggunakan 3 alternatif yakni filtrasi, biofilter anaerob, dan metode kombinasi. Masing-masing alternatif mencapai efisiensi pengurangan efluen hingga 92,26%. Rencana Anggaran Biaya (RAB) untuk operasional dan bangunan IPAL adalah Rp13.702.933.
Analisa Kualitas Air Sungai Tukad Badung, Denpasar, Bali Menggunakan Program QUAL2Kw Richarta Vichotama Nur A. A; Riyanto Haribowo; Tri Budi Prayogo
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.04

Abstract

Sungai Tukad Badung secara fisik terbilang baik, namun memiliki kualitas air yang buruk. Penelitian ini bertujuan untuk mengetahui kondisi eksisting kualitas air Tukad Badung dan mengetahui kondisi daya tampung pencemaran berdasarkan analisa program QUAL2Kw. Dari hasil analisa, kondisi kualitas air pada daerah studi menunjukkan dua dari delapan parameter (Fosfat dan BOD) tidak memenuhi baku mutu kelas II. Sedangkan Daya Tampung Pencemaran sungai Tukad Badung pada TSS yakni 17,77 ton/hari, pada BOD 27,49 ton/hari, pada COD 93,63 ton/hari, dan pada Fosfat 7,65 ton/hari. Pada prediksi kualitas air Tukad Badung tahun 2024, terjadi penurunan kualitas air pada sungai Tukad Badung, hal ini dapat diprediksi dari trend penurunan kualitas air yang dihitung grafik penurunanya secara polinomial. Beberapa parameter diprediksi tidak memenuhi baku mutu kelas II yakni pada parameter BOD dan  Fosfat, sama seperti pada tahun-tahun sebelumnya. BOD memiliki penurunan sebesar -8,93% (konsentrasi BOD naik 8,93%) dan Fosfat memiliki penurunan sebesar -16,67% (konsentrasi fosfat naik 16,67%).
Analisa Keruntuhan Bendungan Malahayu Kabupaten Brebes Dengan Aplikasi HEC-RAS dan Perhitungan Kerugian Dengan Aplikasi InaSAFE Adhitya Zein Muammar; Pitojo Tri Juwono; Runi Asmaranto
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.03

Abstract

In the simulation using HEC-RAS 5.0.7 the part to be simulated is the condition of the Malahayu Dam which collapsed due to 7 conditions causing inundation in the downstream area of the Malahayu Dam. Obtained from 7 conditions of dam collapse, the overtopping collapse scenario is the most extreme collapse scenario with an inundation area of 143.54 km2 with a maximum flood inundation height of 19.943 m. The purpose of this dam collapse simulation is to get the most extreme inundation so that in the next process of the inundation, the calculation of economic losses will be carried out with the help of the InaSAFE application. Losses resulting from the Malahayu Dam collapse scenario cover 53 villages from 6 sub-districts so that the evacuation victims reached 22400 people. With this amount, it can be determined that the Malahayu Dam is a dam with a hazard level 4, which is very high. The estimated losses incurred as a result of this collapse reached Rp. 515,521,114,788. The purpose of this study is to determine the level of danger of a dam, to know the characteristics of the flood, and to know the losses caused by flooding due to dam collapse.
Analisa Keruntuhan Bendungan Batujai dan Pengga dengan Aplikasi HEC-RAS 5.0.7 Diah Fitri Maulida; Pitojo Tri Juwono; Runi Asmaranto
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.06

Abstract

ABSTRACT: Batujai and Pengga Dam are cascade dams with homogeneous types, are authorized in 1982 and 1994. These dams are located at the same mainstream that ends at Alas Strait. Batujai and Pengga Dam break may occur due to overtopping and piping. According to HEC-RAS 5.0.7 simulation suggested that the collapsed of each or both dams has the biggest impact when conditioned with design flood of QPMF are due to overtopping, when the peak of discharge are at 2036.151 m3/second and 3204.089 m3/second, which caused 34.127 km2 and 107.025 km2 area to be flooded, with maximum inundation of 19.656 meters and 19.837 meters. According to InaSAFE, if the collapse of these dams were merged, reported that there are 34 villages and 29,100 people are exposed to the risk, classified with high disaster risk. The cost that has to be paid by the dam’s owner due to the collapse is estimated to be  Rp 201,584,808.36/Ha or Rp. 2,845,409,886,907 in total.
Studi Pola Operasi Normal Waduk Mamak di Kabupaten Sumbawa Provinsi Nusa Tenggara Barat Noval Irfan Kurnianto; Sri Wahyuni; Moh. Sholichin
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.07

Abstract

The reservoir operation of Mamak reservoir in Sumbawa Regency Province of West Nusa Tenggara with trial and error method and it’s also not equipped with Rule Curve for Reservoir Operation so It’s faced with limited water availability in water releasing for dry season.The purpose of this study was to analyze about potential inflow and the irrigation water requirement based on planting pattern scenario. From the analysis that has been done is expected to provide an overview about the rule curve of normal operation. By  ± 81,87 million m3 of potential inflow in wet season and ± 41,14 million  m3 in dry season, the lowest irrigation water requirement was found on MT – I December-1, in wet season need to apply K factor = 0,70 for MT-I and K factor = 0,60 for MT-II to reduce that number of irrigation water requirement by ±38,73 million m3.In analyzing irrigation water requirement, It also planned with three period of planting pattern scenario so the amount of irrigation water requirement equals to 61,23 million m3 in wet season, and in dry season need to apply K factor = 0,70 for MT-I and K factor = 0,60 for MT-II. Operator can set water level on normal operation area based on the rule curve of normal operation.
Studi Penjadwalan Pelaksanaan Pembangunan Bendung Boreng Kabupaten Lumajang dengan Menggunakan Microsoft Project Manager 2016 Arzil Abdillah Bahreisy; Pitojo Tri Juwono; Very Dermawan
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 2 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.02.09

Abstract

Fase proyek dari perencanaan teknis hingga implementasi pembangunan bendung ini, diperlukan suatu manajemen konstruksi yang mempengaruhi kualitas dan kuantitas proyek. Penerapan manajemen konstruksi baik perkiraan jadwal maupun biaya sangat bermanfaat, karena dapat memberikan peringatan dini mengenai hal-hal yang mungkin akan terjadi pada masa pelaksanaan nantinya. Tujuan skripsi ini adalah melakukan studi tentang penjadwalan pembangunan bendung boreng kabupaten Lumajang dengan menggunakan Microsoft Manager 2016 sebagai aplikasi untuk menunjang proses dan tahapan penjadwalan nantinya. Untuk melakukan studi ini dibuatlah alternatif dengan cara menambah sumber daya setelah optimasi. Evaluasi tersebut mencakup berapa besar biaya dan kebutuhan sumber daya.Metode penggunaan data dalam studi menggunakan data sekunder seperti data kontrak dan data teknis bendung yang diperoleh dari konsultan perencana. Setelah data tersebut dilakukan analisis dengan menghitung alat produktivitas yang digunakan, menganalisis analisis tugas, Rencana menganalisis Anggaran, menentukan durasi pekerjaan, analisa kebutuhan sumber daya, menentukan ketergantungan waktu, membuat jadwal proyek, melakukan analisa percepatan, melakukan perbandingan antara penjadwalan dan biaya yang ada baik sebelum percepatan maupun setelah percepatan. Dari hasil penelitian, bendung yang direncanakan dengan Anggaran biaya konstruksi pembangunan bendung Boreng dan bronjong direncanakan sebesar Rp. 7.946.579.907,42.Menurut hasil evaluasi pada pekerjaan normal dengan waktu pelaksanaanya selama (126 hari) dengan biaya sebesar Rp. 7.446.004.652,38. Dan terdapat perbedaan dari hasil setelah optimasi dengan menambah sumber daya dengan waktu pelaksanaan selama (104 hari) dengan biaya sebesar Rp. Rp. Rp. 7.447.716.619,23. mengalami percepatan waktu selama 22 hari dengan efisiensi waktu 17,46% dari waktu normal dengan kenaikan biaya sebesar Rp. 1.711.966,85 dari anggaran waktu normal. 46% dari waktu normal dengan kenaikan biaya sebesar Rp. 1.711.966,85 dari anggaran waktu normal. 46% dari waktu normal dengan kenaikan biaya sebesar Rp. 1.711.966,85 dari anggaran waktu normal.
Studi Perbandingan Efisiensi Perbaikan Mutu Air Limbah Domestik melalui Filtrasi Horizontal dengan Beton Porous Recycled Aggregate Berlapis Ariza Julian Hakim; Evi Nur Cahya; Riyanto Haribowo
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.10

Abstract

Domestic wastewater pollution is one of the reasons for the decline in the national Water Quality Index. The increasing number of people with inadequate sanitation facilities requires a solution. Porous concrete with RCA aggregate has the potential to improve domestic wastewater. Made of porous concrete, the filter is made with dimensions of 40×40×5 cm3 using RCA aggregate with 0.5-2.0 cm gradation. Two reactor models of the same size were prepared, containing 3 and 4 layers of filters. Domestic wastewater as a test object comes from Tlogomas Integrated Sewer System, flowed continuously into the model. The results of Test 1 show that the 3-Filters Reactor Model can improve the pH and COD values according to the quality standard, while the 4-Filters Reactor Model can only improve the pH value. The results of Test 2 show that the 3-Filters Reactor Model can improve the pH and TSS values according to the quality standard, while the 4-Filters Reactor Model can only improve the pH value. The average efficiency of the filtration against influent shows that the 3-Filters Reactor Model is better than the 4-Filters Reactor Model with the percentage of improvement in pH 11.54%, BOD 26.15%, COD 20.79%, and TSS 46.37%. However, in sediment trapping, the 4-Filters Reactor Model is superior with 112 mm compared to the 3-Filters Reactor Model which is 100.5 mm.
Studi Perencanaan Pola Operasi Waduk Kuningan Untuk Memenuhi Kebutuhan Air Baku, Irigasi, dan PLTA di Kabupaten Kuningan Jawa Barat Ratu Anita Rachmawati; Widandi Soetopo; Pitojo Tri Juwono
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 1 No. 1 (2021): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2021.001.01.18

Abstract

Perkembangan Kabupaten Kuningan dari tahun ke tahun semakin pesat sehingga menyebababkan turut pesatnya kebutuhan air penduduknya. Pembangunan Waduk Kunigan diharapkan bisa mencukupi kebutuhan air penduduk Kabupaten Kuningan. Pada penelitian ini melihat besarnya kebutuhan air  maka perlu adanya optimasi guna memenuhi kebutuhan air yang diperlukan dan metode optimasi yang dipilih adalah Algoritma Genetik. Mode ini dijalankan dengan spreadsheet Excel dari Microsoft Office versi 2007. Menurut hasil analisis, Pusat tahapan optimasi dengan Algoritma genetik  pada struktur daripada kromosom.  Kromosom dalam hal ini adalah aturan lepasan waduk yang mewakili alternatif solusi, jadi kromosom ini bisa dikatakan interfal lepasan waduk yang bermacam macam variasinya & mempunyai nilai kinerja Menurut fungsi tujuan. Setelah dilakukan optimasi, rata-rata kebutuhan air meningkat 63,83%, dan kebutuhan air minimal meningkat 44,57%. Keadaan tampungan waduk minimal 2,55 juta meter kubik, dan kapasitas tampungan air rata-rata 17,01 juta meter kubik. Rata-rata energi yang dihasilkan PLTA meningkat 14,72%, dan energi minimum yang dihasilkan PLTA meningkat 72,53%. Sehingga dapat memaksimalkan kinerja reservoir tanpa mengalami kerusakan. Hal ini diharapkan dapat memberikan acuan untuk pedoman lepasan teroptimal pada pengoperasiannya waduk Kuningan agar keperluan irigasi, air baku, dan PLTA terpenuhi The development of Kuningan Regency from year to year is increasing rapidly, causing the rapid need for water for its population. It is hoped that the Kunigan Reservoir construction can meet the water needs of the residents of Kuningan Regency. In this study, seeing the amount of water demand, it is necessary to optimize it to meet the required water needs and the chosen optimization method is the Genetic Algorithm. This mode is run with Excel spreadsheets from Microsoft Office 2007 version. Based of the analysis results, the optimization phase centers with genetic algorithms on the structure rather than chromosomes. The chromosome in this case is the reservoir discharge rule that represents an alternative solution, so this chromosome can be said to be the interface discharge of the reservoir which has various variations and has a performance value based on the objective function. After optimization, the average water demand increased by 63.83%, and the minimum water requirement increased by 44.57%. The condition of the reservoir is at least 2.55 m3, and the average storage capacity is 17.01 m3. The average energy produced by PLTA increased by 14.72%, and the minimum energy produced by PLTA increased by 72.53%. So that it can maximize reservoir performance without experiencing damage. This is expected to provide an overview of the optimal release guidelines for the operation of the Kuningan reservoir to meet the needs for irrigation, raw water and hydropower.

Page 1 of 56 | Total Record : 557