Gema
Vol 27, No 50 (2015): GEMA, THN XXVII/50/Pebruari - Juli 2015

WORKLOAD ANALYSIS FOR DETERMINING THE NUMBER OF EMPLOYEES AT BANKING COMPANIES

Purnomo, Hari (Unknown)



Article Info

Publish Date
28 Jul 2015

Abstract

At recent times, some companies have made some improvements in workforce planning, including in banking company. This study is aimed to determine the workload at the banking companies in Special Region of Yogyakarta. The result of the workload calculation was used to determine the number of employee. The method used to determining the workload was based on the Standard Time calculation (ST) using a stopwatch. Such calculations were conducted in each element on the activities of a cash deposit, bank clearing, cash withdrawal and withdrawal with cheque. The result of standard time in each activity showed 8.48 minutes/activity for the cash deposit, 2.79 minutes/activity for the bank clearing, 8.65 minutes/activity for cash withdrawal, 8.16 minutes/activity for the withdrawal by cheque and 1.04 for workload calculation indicated the abnormality of the workload. By contrast, the result of workload calculation was at the tolerance without any need to hire employee

Copyrights © 2015






Journal Info

Abbrev

GM

Publisher

Subject

Religion Agriculture, Biological Sciences & Forestry Economics, Econometrics & Finance Education Languange, Linguistic, Communication & Media Social Sciences

Description

Jurnal Ilmiah Gema diterbitkan dua kali setahun, pada bulan Februari dan Agustus, oleh Universitas Islam Batik Surakarta. Jurnal Gema bertujuan untuk mepublikasikan hasil penelitian Dosen maupun peneliti. Jurnal Ilmiah Gema menyambut baik makalah dengan tujuan dan ruang lingkup di atas. Redaksi ...