Unisma Sports Center Building Project Control Analysis Using the Critical Path Method (CPM)

Ruli Saefudin (Universitas Islam Malang)
Ade Fitriyanti Ulul Azmi (Universitas Islam Malang)



Article Info

Publish Date
30 Mar 2024

Abstract

The purpose of this research is to determine the scheduling activities for the construction of the Sport Center Building at the Islamic University of Malang, to determine and analyze the control of building construction projects managed by the Islamic University of Malang using the CPM (Critical Path Method) method. This research uses the research method used in this research, namely the descriptive method. The data collection techniques used were observation, interviews, and library research. After obtaining information through interviews, data analysis was carried out using the CPM (Critical Path Method) method. The researcher has completed the research and from this analysis, the researcher found that the construction work carried out by the Islamic University of Malang required 180 days of work using the CPM (Critical Path Method) method, so the optimal duration of the project can be accelerated to 33 days so that the initial project duration is 196 days. working days to 163 days with an efficiency of 16,837%

Copyrights © 2024






Journal Info

Abbrev

CVL

Publisher

Subject

Description

Jurnal Penelitian Teknik Sipil UNISLA (ISSN2503-2399) adalah jurnal ilmiah yang bertujuan untuk mengkomunikasikan hasil dan riset teknologi dalam rangka untuk pengembangan teknologi di bidang teknik sipil. Sasaran pembaca adalah para ilmuwan, akademis, serta praktisi dari bidang teknik sipil sebagai ...