Journal of Engineering and Management in Industrial System
Vol 12, No 1 (2024)

A MODIFICATION OF TIBREWALA, PHILIPPE, AND BROWNE'S ALGORITHM FOR MULTI-SHIFT MANUFACTURING WORKERS SCHEDULING

Wahyudi, Adhie Tri (Unknown)
Zendrato, Rosleini Ria Putri (Unknown)
Indrasari, Anita (Unknown)
Suparti, Erni (Unknown)
Prayuda, Fendi (Unknown)
Cahyawati, Amanda Nur (Unknown)



Article Info

Publish Date
10 Jul 2024

Abstract

The SME under study, which specializes in hard wooden and leather furniture for foreign markets, encountered difficulties in integrating their make-to-order production system with tight shipping export deadlines. This necessitated a systematic worker scheduling technique in order to satisfy production targets and reduce labor expenditures. The aim of this research was to design a worker scheduling system to ensure that the production makespan corresponded to the available time limitations. The study found that the Tibrewala, Philippe, and Browne algorithm for multi-shift workers scheduling significantly reduced labor costs while ensuring order fulfillment within predefined constraints, emphasizing the need for additional research that includes all production cost variables for more comprehensive cost savings.

Copyrights © 2024






Journal Info

Abbrev

jemis

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Journal of Engineering and Management in Industrial System is a peer reviewed journal. The journal publishes original papers at the forefront of industrial and system engineering research, covering theoretical modeling, inventory, logistics, optimizations methods, artificial intelligence, bioscience ...