Perbandingan Biaya dan Waktu Pelaksanaan Pekerjaan Pelat Lantai Metode Precast Half Slab, Full Slab dan Konvensional

Artiani, Gita Puspa (Unknown)
Indriasari (Unknown)
Dwi Lestari (Unknown)



Article Info

Publish Date
15 Oct 2023

Abstract

Construction development in Indonesia continues to progress from year to year. One of the most expensive construction jobs is concrete floor slab work. This forces contractors to choose methods that save more costs and time. Therefore, this research aims to compare 3 methods, namely precast half slab, full slab and conventional methods which are quantitatively carried out by collecting data on project drawings, RAB and project schedule, then analyzed to get the total cost, time and volume of floor slab work. in each method using the Microsoft Excel 2021 program so that calculation results are obtained in terms of costs that are more effective and efficient by applying the precast half slab method for multi-storey building work scales. Where the precast half slab method requires a total cost of Rp. 4,159,526,137, the full slab method requires a total cost of Rp. 4,885,501,898 while the conventional method requires a total cost of Rp. 4,605,483,760. In terms of time, the full slab method is more effective with a total of 105 days of work, while half slab requires 150 days and conventional requires 210 days

Copyrights © 2023






Journal Info

Abbrev

sikris

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Decision Sciences, Operations Research & Management Materials Science & Nanotechnology Mathematics Transportation

Description

Tujuan jurnal ini adalah untuk mempublikasikan dan menyebarluaskan artikel penelitian dan review artikel orisinal yang berkualitas tinggi pada bidang Teknik Sipil yaitu: Struktur Transportasi Managemen Konstruksi Geologi Teknik Mekanika Bahan bidang terkait lainnya yang berkaitan dengan keilmuan ...