Setrum : Sistem Kendali-Tenaga-elektronika-telekomunikasi-komputer
Vol 13, No 2 (2024): Edisi Desember 2024

Dampak Penyambungan PLTM Bayang Nyalo ke Sistem 20 kV PLN ULP Painan, Sumatera Barat

Nasir, Muhammad (Universitas Andalas)
Kamil, Insannul (Universitas Andalas)
Adrianti, Adrianti (Universitas Andalas)
Syafdini, Riki (PT PLN UID Sumatera Barat)



Article Info

Publish Date
05 Dec 2024

Abstract

The electric power distribution system will change very quickly along with the growth of the load which tends to increase every year. The increase of electricity demand must be anticipated with the addition of the number of generating plants that will integrate to the system in order to carry out continuous and optimal system operations. Before adding new generators to the system, a feasibility study will be conducted to provide optimal results using simulation of power flow studies. The connection of the Bayang Nyalo Hydro Power (BNHP) to the medium voltage 20 kV electricity system of the PLN with several operating scenarios provide significant results. The most optimal results have been obtained with scenario 2-2, which the operating voltage changed from 0.80 pu to 0.95 pu and power losses decreased from 2.04 MW to 1.67 MW. This provides a recommendation that the operating scheme of scenario 2-2 should be applied when the Bayang Nyalo Power Plant connects the PLN 20 kV system because this scenario does not require additional new investment from PLN.

Copyrights © 2024






Journal Info

Abbrev

jis

Publisher

Subject

Education

Description

SETRUM : Sistem Kendali Tenaga Elektronika Telekomunikasi Komputer merupakan jurnal yang diterbitkan oleh Jurusan Teknik Elektro, Fakultas Teknik, Universitas Sultan Ageng Tirtayasa (UNTIRTA) sejak 2012 menggunakan sistem Open Journal System ...