Articles
A Distribution Line Protection Scheme for Network with Distributed Generation
Adrianti, Adrianti;
Asharry, Edwindiansyah;
Nasir, Muhammad
JURNAL NASIONAL TEKNIK ELEKTRO Vol 10, No 2: July 2021
Publisher : Jurusan Teknik Elektro Universitas Andalas
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (393.444 KB)
|
DOI: 10.25077/jnte.v10n2.920.2021
Installation of distributed generations (DGs) can cause performance degradation of distribution lines protection. Therefore, the objective of this paper is to propose a protection scheme that can be a solution for this protection line degradation.. The proposed scheme consist of quadrilateral distance relays at upper stream of the lines and directional overcurrent relays at downstream of the lines. The performance of the scheme was tested using Digsilent Powerfactory simulation. The simulation was carried out for four fault types, 0 - 50 Ohms fault resistance and four network conditions/scenarios. The test system consist of three current source i.e. Grid, DG1 and DG2. Variation on-off state of the three current sources is applied in order to check the ability of the scheme to perform correctly for multiple network condition and possibility installation of new DG in the future. The results show that the scheme perform correctly for all bolted fault regardless of fault types, fault location and network scenarios. For three phase and two phase to ground faults the scheme perform correctly for all simulated fault resistance. However, for single line to ground faults and phase to phase faults, the scheme has limitation on maximum fault resistance that can result in correct operation. In general, the proposed scheme able to protect the distribution lines better than the scheme of previous research, but it has a slightly higher chance to perform unwanted operation.Keywords :Â Distribution line protection, distributed generation, quadrilateral distance relay, directional overcurrent relay
Rekonfigurasi Jaringan Distribusi Listrik Universitas Andalas Untuk Memperbaiki Indeks Energy Not Supplied
Asri, Shaumi Novila;
Adrianti, Adrianti;
Nasir, Muhammad
JURNAL NASIONAL TEKNIK ELEKTRO Vol 8, No 1: March 2019
Publisher : Jurusan Teknik Elektro Universitas Andalas
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (634.418 KB)
|
DOI: 10.25077/jnte.v8n1.623.2019
This research aims to improve the reliability of electrical distribution networks of Universitas Andalas using network reconfiguration. Reliability calculation is carried out using series-parallel block diagram. The calculated reliability indexes are failure rates, annual down times and energy not supplied (ENS). The reconfiguration is focused for load points that have highest ENS. For these load points, reconfiguration was done by transferred their power supply to nearer distribution substation by installed new feeders. As a result, the distribution network changes it shape into loop configuration, although during operation it still has radial configuration. The reconfiguration has been success in reducing the ENS values of Universitas Andalas distribution network. The highest load point’s ENS i.e. 315,191 kWh/year has been reduced into 142,864 kWh/year. Keywords : Energy not supplied, reliability, reconfiguration, distribution networkAbstrakPenelitian ini bertujuan untuk memperbaiki keandalan jaringan distribusi listrik Universitas Andalas dengan rekonfigurasi jaringan. Perhitungan keandalan dilakukan menggunakan metode blok diagram seri-paralel. Parameter keandalan yang dihitung yaitu laju kegagalan, annual downtimes serta Energy Not Supplied (ENS). Rekonfigurasi dilakukan dengan fokus pada titik-titik beban yang memiliki indeks ENS yang terbesar. Titik-titik beban tersebut direkonfigurasi dengan memindahkan supply dayanya ke gardu yang lebih dekat dengan penambahan saluran baru. Akibatnya bentuk jaringan berubah menjadi konfigurasi loop, tetapi pada saat beroperasi jaringan tetap dalam konfigurasi radial. Dari rekonfigurasi yang diusulkan, nilai ENS sistem distribusi Universitas Andalas berhasil diturunkan dari nilai tertinggi 315,191 kWjam/tahun menjadi 142,864 kWjam/tahun. Sehingga lama dan frekuensi pemadaman listrik di titik-titik beban berhasil dikurangi yang pada akhirnya diharapkan dapat membantu meningkatkan produktivitas di Universitas AndalasKata Kunci : Energy not supplied, keandalan, rekonfigurasi, jaringan distribusi
Evaluasi Keandalan Pembangkit Listrik Tenaga Surya yang Terhubung ke Grid
Adrianti, Adrianti
JURNAL NASIONAL TEKNIK ELEKTRO Vol 5, No 2: Juli 2016
Publisher : Jurusan Teknik Elektro Universitas Andalas
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (563.909 KB)
|
DOI: 10.25077/jnte.v5n2.281.2016
The reliability of a photovoltaic system is influenced by two kind of challenges i.e. the availability of the sunlight and the readiness of the PV system components to generate power. A PV system consists of electronic components which are placed outdoors and suffered harsh weather, therefore its reliability needs to be evaluated. Bayesian Networks are utilized to calculate the probabilities of having full and reduced power output of the PV system. The study results show that the reduced power output state of the PV system is twice more likely than the no-output state. In general, the reliability of the PV system is relatively good.Keywords : Photovoltaic, Reliability and Bayesian NetworkAbstrak— Keandalan Pembangkit Listrik Tenaga Surya (PLTS) dipengaruhi oleh dua jenis permasalahan yaitu ketersediaan cahaya matahari dan kesiapan peralatan PLTS untuk membangkitkan daya listrik. Peralatan PLTS terdiri dari perangkat elektronik yang ditempatkan di luar ruangan dan mengalami berbagai kondisi cuaca, sehingga perlu dievaluasi keandalannya dalam membangkitkan daya listrik. Pada tulisan ini dilakukan evaluasi keandalan PLTS dari segi kesiapaan peralatan untuk membangkitkan daya. Metoda Bayesian Network digunakan dalam menghitung probabilitas PLTS untuk menghasilkan daya penuh dan tidak penuh (reduced output). Hasil yang diperoleh menunjukkan probabilitas kondisi tanpa output daya pada PLTS dua kali lebih sedikit dibandingan reduced output. Secara keseluruhan keandalan PLTS cukup baik.Kata Kunci : PLTS, keandalan dan Bayesian Network
Pemilihan Relai Proteksi Anti Islanding untuk Pembangkit Tersebar
Adrianti, Adrianti
JURNAL NASIONAL TEKNIK ELEKTRO Vol 6, No 3: November 2017
Publisher : Jurusan Teknik Elektro Universitas Andalas
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (506.681 KB)
|
DOI: 10.25077/jnte.v6n3.489.2017
Regulation of grid connected distributed generation (DG) in various countries states that in the event of disconnection of the grid, DG(s) must be disconnected from the distribution networks. This because an unplanned islanding can cause several hazard such as: failure of protection relays to detect faults, unsynchronized grid connection, electrocute risk for electrical workers and uncontrolled voltage and frequency in the network. There several anti-islanding protection with different detection methods that can be choose. Therefore, a suitable protection must be selected carefully. Sensitivity of anti-islanding relays are influenced by DG’s generation technology. In this paper, a method to select an anti-islanding protection is proposed. The selection is based on DG’s capacity, generating technology and cost. The proposed method has been applied to a case study of synchronous machine DG. At the beginning there is a doubt that a ROCOF protection may not be a suitable choice because DG’s capacity quite closed to the maximum load in the network. But, after a rigorous analysis it shows that ROCOF protection can be applied to the DG with good sensitivityKeywords : Anti-islanding protection, Distributed Generation and ROCOFAbstrakDalam aturan penyambungan pembangkit tersebar (PT) ke grid di berbagai negara, terdapat aturan bahwa jika grid terputus dari jaringan distribusi (islanding), PT harus segera diputuskan dari jaringan. Hal ini dilakukan untuk mencegah bahaya yang ditimbulkan oleh operasi islanding yang tidak direncanakan. Bahaya tersebut antara lain: peralatan proteksi yang ada akan gagal mendeteksi gangguan, penyambungan kembali grid tanpa sinkronisasi, bahaya tersengat listrik pada pekerja, serta tegangan dan frekuensi yang dihasilkan tidak terkontrol. Ada beberapa pilihan relai anti islanding yang dapat digunakan. Relai-relai anti islanding ini memiliki cara deteksi yang berbeda satu dengan lainnya, sehingga perlu dipilih metoda yang paling sesuai. Sensitivitas sebuah relai akan tergantung teknologi pembangkitan yang dimiliki oleh PT. Karena itu diusulkan sebuah metoda pemilihan relai anti islanding yang didasarkan tidak hanya dari teknologi pembangkitan yang digunakan, tapi juga kapasitas PT dan biaya yang harus dikeluarkan untuk pengadaan proteksi tersebut. Aplikasi metoda yang diusulkan pada kasus PT dengan teknologi generator sinkron menunjukkan bahwa metoda ini berhasil memilih peralatan yang sesuai, yaitu relai ROCOF. Walaupun pada awal analisa ada kekhawatiran relai ini tidak cukup sensitif akibat kedekatan keluaran PT dengan beban maksimum, namun dengan analisa yang lebih detail diperoleh relai ROCOF cocok untuk diaplikasikan.Kata Kunci : Proteksi anti islanding, Pembangkit tersebar dan ROCOF
Maximum Capacities of Distributed Generation in order to Avoid Failures of the Overcurrent Relay Coordination on a Distribution Networks
Adrianti, Adrianti;
Prasetya, Rudy
JURNAL NASIONAL TEKNIK ELEKTRO Vol 5, No 3: November 2016
Publisher : Jurusan Teknik Elektro Universitas Andalas
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (331.45 KB)
|
DOI: 10.25077/jnte.v5n3.331.2016
Penempatan pembangkit tersebar (DG) di jaringan distribusi sering kali mengubah arah dan besar arus baik saat kondisi normal maupun kondisi gangguan. Perubahan tersebut bisa mempengaruhi sistem proteksi yang sudah terpasang, sehingga sistem proteksi tersebut mungkin tidak bekerja seperti yang diharapkan setelah pemasangan DG. Karena kapasitas DG umumnya kecil maka penggantian sistem proteksi untuk mengatasi masalah proteksi tersebut akan menjadi tidak ekonomis. Denga alasan tersebut, tulisan ini mengusulkan sebuah metode untuk mencari maksimum kapasitas DG yang dapat dipasang tanpa menyebabkan kegagalan operasi dan koordinasi sistem proteksi yang sudah ada. Studi kasus di jaringan distribusi Sumatera Barat digunakan untuk mengilustrasikan metodologi yang diusulkan. Hasil penelitian menunjukkan bahwa semakin ke hilir suatu bus dari grid maka semakin kecil kapasitas DG yang dapat dipasang.Keywords : Pembangkit tersebar, kapasitas maksimum DG, relai arus lebih, koordinasi relaiAbstract— The installation of a Distributed Generation (DG) in a distribution system often changes the direction and magnitude of current for normal and faulted conditions. The changes may affect the existing protection system hence it may not work as intended to after the installation. Since DG capacity is often small, it will not be economical to invest in the changing/replacement of the protection system. For that reason, this paper proposes a methodology to find maximum capacities of DGs that can be installed without cause failures to the existing protection operation and its coordination. A case study of a distribution network in West Sumatera is present to illustrate the methodology. The results show that the more downstream of buses from the grid, the less DG capacity that can be installed.Keywords : Distributed generation, maximum capacity of DG, overcurrent relay, relay coordination
Rekonfigurasi Relai Proteksi setelah Penambahan Pembangkit Tersebar pada Jaringan Distribusi
Adrianti, Adrianti;
Mukhlisiah, Nurul
JURNAL NASIONAL TEKNIK ELEKTRO Vol 6, No 2: Juli 2017
Publisher : Jurusan Teknik Elektro Universitas Andalas
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (460.37 KB)
|
DOI: 10.25077/jnte.v6n2.420.2017
Installation of distributed generation (DG) on a distribution network can change the direction of electrical current during normal and faulted condition. This change can cause failures to operate of the existing relay protection. The failures are including unwanted operation and protection blinding. Therefore, evaluation of the existing protection after DG installation is needed. This paper proposes a method for reconfiguration and resetting of the relays after installation of a DG on the sensitive part of a distribution network i.e. the very downstream of the distribution network. The reconfiguration suggests the application of directional overcurrent relay in order to distinguish the sources of fault current: from the grid and from the DG. The reconfiguration and the resetting results then are simulated in ETAP software. The simulation is carried out for several variation i.e. DG capacity, type of fault and fault position on the network. From the simulation can be concluded that the reconfiguration and resetting of the protection relays after installation of the DG have provided a correct operation of protection coordination as intended to.Keywords: Distributed Generation (DG), Directional Overcurrent Relay, Protective Coordination.     Abstrak— Pemasangan Pembangkit Tersebar (PT) di jaringan distribusi dapat mengubah arah aliran arus saat kondisi normal dan kondisi gangguan. Hal ini dapat menyebabkan relai-relai proteksi yang sudah ada sebelum pemasangan PT tidak bekerja sebagaimana seharusnya. Relai dapat mengalami maloperasi ataupun tidak berhasil mendeteksi adanya gangguan di daerah proteksinya. Untuk itu, perlu dilakukan pengkajian ulang terhadap kerja dan koordinasi relai-relai setelah penambahan DG. Pada tulisan ini, dilakukan upaya rekonfigurasi dan resetting relai-relai proteksi setelah penambahan PT di bagian yang sensitif dari jaringan distribusi, yaitu bagian paling hilir. Perbaikan dilakukan dengan menambahkan relai arus lebih berarah untuk mengantisipasi sumber arus gangguan dari grid dan PT yang berbeda arah, serta setting ulang relai-relai akibat perubahan yang disebabkan oleh pemasangan PT. Selanjutnya, dilakukan pengujian koordinasi relai yang telah direkonfigurasi dan diresetting tersebut menggunakan software ETAP. Untuk mengantisipasi kondisi PT yang dapat berubah dilakukan variasi kapasitas PT yaitu kapasitas penuh, setengah kapasitas dan kondisi PT terlepas dari jaringan. Pengujian urutan kerja relai ini dilakukan pada berbagai titik gangguan dan untuk setiap titik gangguan disimulasikan 3 jenis gangguan yaitu gangguan tiga fasa, antar fasa dan satu fasa ke tanah. Dari pengujian tersebut didapatkan bahwa rekonfigurasi dan resetting yang sudah dilakukan berhasil memberikan koordinasi relai yang benar untuk ketiga macam kapasitas PT tersebut.Kata Kunci :, Pembangkit Tersebar , Relai arus lebih berarah, Koordinasi proteksi.        Â
Evaluasi Keandalan Pembangkit Listrik Tenaga Surya yang Terhubung ke Grid
Adrianti Adrianti
JURNAL NASIONAL TEKNIK ELEKTRO Vol 5 No 2: Juli 2016
Publisher : Jurusan Teknik Elektro Universitas Andalas
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (563.909 KB)
|
DOI: 10.25077/jnte.v5n2.281.2016
The reliability of a photovoltaic system is influenced by two kind of challenges i.e. the availability of the sunlight and the readiness of the PV system components to generate power. A PV system consists of electronic components which are placed outdoors and suffered harsh weather, therefore its reliability needs to be evaluated. Bayesian Networks are utilized to calculate the probabilities of having full and reduced power output of the PV system. The study results show that the reduced power output state of the PV system is twice more likely than the no-output state. In general, the reliability of the PV system is relatively good.Keywords : Photovoltaic, Reliability and Bayesian NetworkAbstrak— Keandalan Pembangkit Listrik Tenaga Surya (PLTS) dipengaruhi oleh dua jenis permasalahan yaitu ketersediaan cahaya matahari dan kesiapan peralatan PLTS untuk membangkitkan daya listrik. Peralatan PLTS terdiri dari perangkat elektronik yang ditempatkan di luar ruangan dan mengalami berbagai kondisi cuaca, sehingga perlu dievaluasi keandalannya dalam membangkitkan daya listrik. Pada tulisan ini dilakukan evaluasi keandalan PLTS dari segi kesiapaan peralatan untuk membangkitkan daya. Metoda Bayesian Network digunakan dalam menghitung probabilitas PLTS untuk menghasilkan daya penuh dan tidak penuh (reduced output). Hasil yang diperoleh menunjukkan probabilitas kondisi tanpa output daya pada PLTS dua kali lebih sedikit dibandingan reduced output. Secara keseluruhan keandalan PLTS cukup baik.Kata Kunci : PLTS, keandalan dan Bayesian Network
Maximum Capacities of Distributed Generation in order to Avoid Failures of the Overcurrent Relay Coordination on a Distribution Networks
Adrianti Adrianti;
Rudy Prasetya
JURNAL NASIONAL TEKNIK ELEKTRO Vol 5 No 3: November 2016
Publisher : Jurusan Teknik Elektro Universitas Andalas
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (331.45 KB)
|
DOI: 10.25077/jnte.v5n3.331.2016
Penempatan pembangkit tersebar (DG) di jaringan distribusi sering kali mengubah arah dan besar arus baik saat kondisi normal maupun kondisi gangguan. Perubahan tersebut bisa mempengaruhi sistem proteksi yang sudah terpasang, sehingga sistem proteksi tersebut mungkin tidak bekerja seperti yang diharapkan setelah pemasangan DG. Karena kapasitas DG umumnya kecil maka penggantian sistem proteksi untuk mengatasi masalah proteksi tersebut akan menjadi tidak ekonomis. Denga alasan tersebut, tulisan ini mengusulkan sebuah metode untuk mencari maksimum kapasitas DG yang dapat dipasang tanpa menyebabkan kegagalan operasi dan koordinasi sistem proteksi yang sudah ada. Studi kasus di jaringan distribusi Sumatera Barat digunakan untuk mengilustrasikan metodologi yang diusulkan. Hasil penelitian menunjukkan bahwa semakin ke hilir suatu bus dari grid maka semakin kecil kapasitas DG yang dapat dipasang.Keywords : Pembangkit tersebar, kapasitas maksimum DG, relai arus lebih, koordinasi relaiAbstract— The installation of a Distributed Generation (DG) in a distribution system often changes the direction and magnitude of current for normal and faulted conditions. The changes may affect the existing protection system hence it may not work as intended to after the installation. Since DG capacity is often small, it will not be economical to invest in the changing/replacement of the protection system. For that reason, this paper proposes a methodology to find maximum capacities of DGs that can be installed without cause failures to the existing protection operation and its coordination. A case study of a distribution network in West Sumatera is present to illustrate the methodology. The results show that the more downstream of buses from the grid, the less DG capacity that can be installed.Keywords : Distributed generation, maximum capacity of DG, overcurrent relay, relay coordination
Rekonfigurasi Relai Proteksi setelah Penambahan Pembangkit Tersebar pada Jaringan Distribusi
Adrianti Adrianti;
Nurul Mukhlisiah
JURNAL NASIONAL TEKNIK ELEKTRO Vol 6, No 2: Juli 2017
Publisher : Jurusan Teknik Elektro Universitas Andalas
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (460.37 KB)
|
DOI: 10.25077/jnte.v6n2.420.2017
Installation of distributed generation (DG) on a distribution network can change the direction of electrical current during normal and faulted condition. This change can cause failures to operate of the existing relay protection. The failures are including unwanted operation and protection blinding. Therefore, evaluation of the existing protection after DG installation is needed. This paper proposes a method for reconfiguration and resetting of the relays after installation of a DG on the sensitive part of a distribution network i.e. the very downstream of the distribution network. The reconfiguration suggests the application of directional overcurrent relay in order to distinguish the sources of fault current: from the grid and from the DG. The reconfiguration and the resetting results then are simulated in ETAP software. The simulation is carried out for several variation i.e. DG capacity, type of fault and fault position on the network. From the simulation can be concluded that the reconfiguration and resetting of the protection relays after installation of the DG have provided a correct operation of protection coordination as intended to.Keywords: Distributed Generation (DG), Directional Overcurrent Relay, Protective Coordination. Abstrak— Pemasangan Pembangkit Tersebar (PT) di jaringan distribusi dapat mengubah arah aliran arus saat kondisi normal dan kondisi gangguan. Hal ini dapat menyebabkan relai-relai proteksi yang sudah ada sebelum pemasangan PT tidak bekerja sebagaimana seharusnya. Relai dapat mengalami maloperasi ataupun tidak berhasil mendeteksi adanya gangguan di daerah proteksinya. Untuk itu, perlu dilakukan pengkajian ulang terhadap kerja dan koordinasi relai-relai setelah penambahan DG. Pada tulisan ini, dilakukan upaya rekonfigurasi dan resetting relai-relai proteksi setelah penambahan PT di bagian yang sensitif dari jaringan distribusi, yaitu bagian paling hilir. Perbaikan dilakukan dengan menambahkan relai arus lebih berarah untuk mengantisipasi sumber arus gangguan dari grid dan PT yang berbeda arah, serta setting ulang relai-relai akibat perubahan yang disebabkan oleh pemasangan PT. Selanjutnya, dilakukan pengujian koordinasi relai yang telah direkonfigurasi dan diresetting tersebut menggunakan software ETAP. Untuk mengantisipasi kondisi PT yang dapat berubah dilakukan variasi kapasitas PT yaitu kapasitas penuh, setengah kapasitas dan kondisi PT terlepas dari jaringan. Pengujian urutan kerja relai ini dilakukan pada berbagai titik gangguan dan untuk setiap titik gangguan disimulasikan 3 jenis gangguan yaitu gangguan tiga fasa, antar fasa dan satu fasa ke tanah. Dari pengujian tersebut didapatkan bahwa rekonfigurasi dan resetting yang sudah dilakukan berhasil memberikan koordinasi relai yang benar untuk ketiga macam kapasitas PT tersebut.Kata Kunci :, Pembangkit Tersebar , Relai arus lebih berarah, Koordinasi proteksi.
Pemilihan Relai Proteksi Anti Islanding untuk Pembangkit Tersebar
Adrianti Adrianti
JURNAL NASIONAL TEKNIK ELEKTRO Vol 6, No 3: November 2017
Publisher : Jurusan Teknik Elektro Universitas Andalas
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (506.681 KB)
|
DOI: 10.25077/jnte.v6n3.489.2017
Regulation of grid connected distributed generation (DG) in various countries states that in the event of disconnection of the grid, DG(s) must be disconnected from the distribution networks. This because an unplanned islanding can cause several hazard such as: failure of protection relays to detect faults, unsynchronized grid connection, electrocute risk for electrical workers and uncontrolled voltage and frequency in the network. There several anti-islanding protection with different detection methods that can be choose. Therefore, a suitable protection must be selected carefully. Sensitivity of anti-islanding relays are influenced by DG’s generation technology. In this paper, a method to select an anti-islanding protection is proposed. The selection is based on DG’s capacity, generating technology and cost. The proposed method has been applied to a case study of synchronous machine DG. At the beginning there is a doubt that a ROCOF protection may not be a suitable choice because DG’s capacity quite closed to the maximum load in the network. But, after a rigorous analysis it shows that ROCOF protection can be applied to the DG with good sensitivityKeywords : Anti-islanding protection, Distributed Generation and ROCOFAbstrakDalam aturan penyambungan pembangkit tersebar (PT) ke grid di berbagai negara, terdapat aturan bahwa jika grid terputus dari jaringan distribusi (islanding), PT harus segera diputuskan dari jaringan. Hal ini dilakukan untuk mencegah bahaya yang ditimbulkan oleh operasi islanding yang tidak direncanakan. Bahaya tersebut antara lain: peralatan proteksi yang ada akan gagal mendeteksi gangguan, penyambungan kembali grid tanpa sinkronisasi, bahaya tersengat listrik pada pekerja, serta tegangan dan frekuensi yang dihasilkan tidak terkontrol. Ada beberapa pilihan relai anti islanding yang dapat digunakan. Relai-relai anti islanding ini memiliki cara deteksi yang berbeda satu dengan lainnya, sehingga perlu dipilih metoda yang paling sesuai. Sensitivitas sebuah relai akan tergantung teknologi pembangkitan yang dimiliki oleh PT. Karena itu diusulkan sebuah metoda pemilihan relai anti islanding yang didasarkan tidak hanya dari teknologi pembangkitan yang digunakan, tapi juga kapasitas PT dan biaya yang harus dikeluarkan untuk pengadaan proteksi tersebut. Aplikasi metoda yang diusulkan pada kasus PT dengan teknologi generator sinkron menunjukkan bahwa metoda ini berhasil memilih peralatan yang sesuai, yaitu relai ROCOF. Walaupun pada awal analisa ada kekhawatiran relai ini tidak cukup sensitif akibat kedekatan keluaran PT dengan beban maksimum, namun dengan analisa yang lebih detail diperoleh relai ROCOF cocok untuk diaplikasikan.Kata Kunci : Proteksi anti islanding, Pembangkit tersebar dan ROCOF