Analisis Penjadwalan Dengan Menggunakan Kurva S Pada Proyek Pembuatan Reactor Tank 30m3

Abdillah, Giyo Sekhan (Unknown)
Waluyo, Minto (Unknown)



Article Info

Publish Date
07 Jan 2025

Abstract

Construction project activities can be defined as an activity that takes place within a limited period of time that has been determined with the allocation of certain resources and is intended to produce products whose quality criteria have been clearly outlined. In completing a construction job, scheduling is one of the things that is very important and needs to be paid attention to. PT. PDK received various projects, one of which was making a 30m^3 reactor tank. This tank work was carried out at the PT workshop. Putra Dharma Kencana. The S curve is a curve that describes the relationship between the accumulated value of development project implementation and project implementation. The weight on the S curve is the percentage of price for each job divided by the total price. If the total weight value is less than 100% then there is an error in the calculation which will affect the S curve. Work on the reactor tank was carried out according to the target, namely for 12 weeks. The disadvantage of the S curve method is the weight calculation. The weight used is the percentage of the price for each job with the total price.

Copyrights © 2025