Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan
Vol 7 No 4 (2018): JURNAL KONSTRUKSI (APRIL 2018)

ANALISIS DAN PERENCANAAN STRUKTUR GEDUNG PKP-PK BANDAR UDARA INTERNASIONAL JAWA BARAT MAJALENGKA

Reza Setia Nugraha (Universitas Swadaya Gunung Djati Cirebon)
Sumarman Sumarman (Universitas Swadaya Gunung Djati Cirebon)



Article Info

Publish Date
23 Jul 2020

Abstract

"> ABSTRAKBandarudara merupakan lapangan terbang yang dipergunakan untuk mendarat dan lepas landaspesawat udara, naik turun penumpang, dan/atau bongkar muat kargo dan/atau pos, serta dilengkapi denganfasilitas keselamatan penerbangan dan tempat perpindahan antar moda transportasi.(Undang-UndangNo.15 1992 tentang penerbangan).Atas dasar kriteria keamanan dan kenyamanan maka proses perencanaan pembebanan harus sesuaidengan SNI - 1727 - 2013 serta perencanaan struktur gedung ini harus mengacu dengan SNI - 2847 - 2013beton bertulang, selain itu dalam perhitungan rekayasa gempa juga harus mengacu pada SNI - 1726 - 2012.Berdasarkan data yang diperoleh dari Bandarudara Internasional Jawa Barat untuk Gedung PKPPK memiliki luas tanah ± 12303.8 m2 dan luas bangunan 1995.3 m2 . Gedung ini menggunakan materialstruktur beton bertulang yang terdiri dari 3 lantai.Analisis struktur digunakan software ETABS. Material beton bertulang yang digunakan untukbalok, kolom, plat atap serta plat lantai. Hasil yang didapat berupa analisis dan gambar desain strukturGedung PKP-PK.Kata Kunci : Analisis dan Perencanaan, Gedung PKP-PK, Kolom, Balok, Plat.ABSTRACKThe airport is an airstrip used for landing and takeoffs of aircraft, passengers, and / or loadingand unloading of cargo and / or mail, and is equipped with aviation safety facilities and places ofintermodal transport (Act No.15 1992 about flights).On the basis of safety and comfort criteria, the process of loading planning shall be in accordancewith SNI - 1727 - 2013 and the design of this building structure shall refer to SNI - 2847 - 2013 reinforcedconcrete, in addition to the calculation of earthquake engineering shall also refer to SNI - 1726 - 2012.Based on data obtained from West Java International Airport for PKP-PK Building has a land areaof ± 12303.8 m2 and building area of 1995.3 m2. This building uses a reinforced concrete structurematerial consisting of 3 floors.Structural analysis used ETABS software. Reinforced concrete material used for beams, columns,roof plates and floor plates. The results obtained in the form of analysis and drawing the design of PKPPK Building structure.Keywords: Analysis and Planning, PKP-PK Building, Column, Beams, Plate.

Copyrights © 2018






Journal Info

Abbrev

Konstruksi

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Transportation

Description

Jurnal Konstruksi dan Infrastruktur (JKI) merupakan kelanjutan dari Jurnal Konstruksi yang diterbitkan oleh Program Studi Teknik Sipil Fakultas Teknik Universitas Swadaya Gunung Djati Cirebon, Indonesia dengan p-issn 2085-8744. Tujuan penerbitan Jurnal Konstruksi dan Infrastruktur (JKI) adalah: (1) ...