Analisis Biaya Beton Bertulang Dan Rangka Struktur Baja Pada Gedung Alfamidi Dc Kendari

Syamsuddin, Syamsuddin (Unknown)
Ilham, Vickky Anggara (Unknown)
Meilani, Sindi (Unknown)



Article Info

Publish Date
29 Apr 2025

Abstract

Cost is a factor that influences the success and failure of a project. This is a parameter for the success of a project which can be seen from the completion time and minimum costs but with guaranteed quality in accordance with planning. Calculation of the Cost Budget Plan (RAB) is the total product of the quantity or volume of each work item together with the unit price of the work. Budget Plan The total cost of structural calculations using the steel structure method and the concrete structure method. The budget plan for the steel structure method is IDR 24.348.341.722,. and for structural work using the concrete structure method it is IDR. 29.071.552.971,65. In the DC Kendari alfamidi warehouse work, the steel and concrete structure method resulted in a difference of IDR 4.723.211,249,48. . For work items that have significant comparative costs, namely column work in concrete structure method structural work is IDR 7.616.810.069,95 and the planned cost budget for the steel structure method is IDR 3,805,657,473,58. In the Kendari DC Alfamidi warehouse work, the difference is found to be IDR 3.811.152.596,37 which means that work on concrete structure columns is more expensive than concrete structures

Copyrights © 2025






Journal Info

Abbrev

scej

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Transportation

Description

SCiEJ is a means of publication for academics, researchers, practitioners, and or other individuals/groups (general) in the field of Civil Engineering. In general, SCiEJ has a scope of study in the field of: Construction Material Building Structural Engineering Harbor & Coastal Engineering Bridge ...