Jurnal Ilmiah Universitas Batanghari Jambi
Vol 15, No 3 (2015): Oktober

EFISIENSI PENGGUNAAN ALAT BERAT PADA PEKERJAAN PEMBANGUNAN TPA (TEMPAT PEMPROSESAN AKHIR ) DESA AMD KEC. MUARA BULIAN KAB. BATANGHARI

Elvira Handayani (Unknown)



Article Info

Publish Date
17 Feb 2017

Abstract

Heavy equipment is a unity that can not be separated in the work of development of infrastructure. Heavy equipment is more profitable than using manual tools because it can get the job done faster development, so the timing of the work can be achieved with the construction optimal.Pekerjaan landfill (final processing) is one job that requires heavy equipment production capacity optimal, because the The job has a job excavation, pile and transport of large volumes, Based on theoretical calculations and analysis in the field, the conclusion that can be drawn from this study are as follows: Difference in production capacity and the efficiency factor of heavy equipment as follows:a. Difference in Production Capacity : Excavator: 56.93 m3 / hour of the analysis in the field, Bulldozer: 7571.92 m2 / h greater theoretically, Vibrator Roller: 1826.67 m3 / h greater theoretically. b. Difference Factor Efficiency : Excavator: 0,003, Bulldozer: 0 (same), Vibrator Roller: 0.011keyword : heavy equipment, construction

Copyrights © 2015






Journal Info

Abbrev

ilmiah

Publisher

Subject

Agriculture, Biological Sciences & Forestry Civil Engineering, Building, Construction & Architecture Economics, Econometrics & Finance Education Law, Crime, Criminology & Criminal Justice

Description

Jurnal Ilmiah Universitas Batanghari Jambi adalah peer-review jurnal akses terbuka yang bertujuan untuk berbagi dan diskusi mengenai isu dan hasil penelitian yang lagi hangat pada saat ini. Jurnal ini diterbitkan oleh Lembaga Penelitian dan Pengabdian pada Masyarakat Universitas Batanghari Jambi, ...