Jurnal Pensil : Pendidikan Teknik Sipil
Vol. 14 No. 2 (2025): Jurnal Pensil : Pendidikan Teknik Sipil

COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD

Susanti, Dwi Dzulma (Unknown)
Supriani, Fepy (Unknown)
Misliniyati, Rena (Unknown)
Mase, Lindung Zalbuin (Unknown)
Hardiansyah (Unknown)



Article Info

Publish Date
30 May 2025

Abstract

Labor productivity is the main parameter in the success of a construction job. This study aims to analyze the level of productivity and the level of Labor Utilization Rate (LUR) in plastering work using the work sampling method, and the most effective time correlation between morning and afternoon. This research was conducted by direct observation for 3 days. The results showed that the highest productivity value was 14.30 m²/hour in the afternoon, and the lowest productivity value was 6.86 m²/hour in the morning. The Labor Utilization Rate (LUR) values in the morning and afternoon were 57.9% and 65.9%, indicating that the afternoon time was more effective than the morning time. However, there was a significant difference in productivity between morning and afternoon time overall, and it can still be categorized as effective with a Labor Utilization Rate (LUR) value of 61.9%, which exceeds 50%.

Copyrights © 2025






Journal Info

Abbrev

jpensil

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Education Other

Description

In general, the Jurnal Pensil : Pendidikan Teknik Sipil accepts manuscripts with the themes: Education Strategy and Management, Industrial Relations, and Civil and Structural Engineering. Jurnal Pensil : Pendidikan Teknik Sipil is intended for all academics in Civil Engineering Vocational Education. ...