SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
Vol 4 (2019): Inovasi Desa Menuju Era 4.0 : Merangsang Inovasi Desa Melalui Pemanfaatan Internet of

METODE PELAKSANAAN PEKERJAAN STRUKTUR BAWAH JEMBATAN CIHIEUM KECAMATAN LEMAHSUGIH KABUPATEN MAJALENGKA

Aditya Rachman, Damas (Unknown)
Hendrayana, Yayat (Unknown)



Article Info

Publish Date
01 Oct 2019

Abstract

Bridge abutments connect the deck, or surface of the bridge, to the ground and help support its weight both horizontally and vertically. On short bridges, one abutment is placed at either end of the bridge and connected to the embankment, sometimes including a retaining wall. The choice of abutment depends on the available space, geologic features of the bridge site, and available funding for the project. This Cihieum bridge was built using a composite steel structure with a span of 30 m and a width of 7 m, consisting of 2 abutments. With an implementation time of 150 calendar days.

Copyrights © 2019






Journal Info

Abbrev

stima

Publisher

Subject

Computer Science & IT Control & Systems Engineering Industrial & Manufacturing Engineering Mechanical Engineering Transportation

Description

Prosiding SEMINAR TEKNOLOGI MAJALENGKA (STIMA) adalah publikasi ilmiah yang memuat hasil-hasil penelitian orisinal dan terkini dari para akademisi, peneliti, dan praktisi di berbagai bidang teknik dan manajemen. Prosiding ini memiliki sifat multidisiplin, berfokus pada integrasi ilmu pengetahuan ...