PENERAPAN MANAJEMEN KONSTRUKSI TERHADAP TIME SCHEDULE PADA PROYEK PENATAAN LAPANGAN GGM

Lepsi Narulita (Unknown)
Asep Dian Heryadiana, ST., S.Pd, MT. (Unknown)



Article Info

Publish Date
08 Aug 2021

Abstract

In the implementation of project work, there is often a delay in its implementation, it is caused by several inhibiting factors, including weather factors, procurement of materials and equipment, and no less important is the factor of human resources that are not optimal. Therefore it is necessary to have a good construction management application to find out the extent to which the project implementation process is according to what has been scheduled or vice versa. This research was conducted starting with a field survey, interviews, analysis of the RAB. From the results of the study using the Time Schedule, the plan and the realization of the implementation of work in the field, there are differences with the existence of deviation of work, but the problem of delays in work can be resolved through a project coordination meeting.

Copyrights © 2021






Journal Info

Abbrev

stima

Publisher

Subject

Computer Science & IT Control & Systems Engineering Industrial & Manufacturing Engineering Mechanical Engineering Transportation

Description

Prosiding SEMINAR TEKNOLOGI MAJALENGKA (STIMA) adalah publikasi ilmiah yang memuat hasil-hasil penelitian orisinal dan terkini dari para akademisi, peneliti, dan praktisi di berbagai bidang teknik dan manajemen. Prosiding ini memiliki sifat multidisiplin, berfokus pada integrasi ilmu pengetahuan ...