ANALISIS KINERJA WAKTU DENGAN MENGGUNAKAN PRECEDENCE DIAGRAM METHOD (PDM) (Reschedule Proyek Pembangunan Jembatan Nangarasong, Kabupaten Sikka, Nusa Tenggara Timur)

Claudia Ekarista Sika Keytimu (Universitas Nusa Nipa)
Oktavianus Jori (Universitas Nusa Nipa)



Article Info

Publish Date
30 Oct 2022

Abstract

Construction projects are developing rapidly both in terms of physicality, time and cost, this rapid construction development is certainly also felt by the construction of the bridge. In the construction of bridges, it often faces challenges in terms of incompatibility between planning schedules and realization in the field. The bridge project that will be used as a case study is located in the Nangarasong area, Sikka Regency, East Nusa Tenggara. This study uses the Precedence Diagram Method (PDM) which aims to find out the time comparison and evaluate the solution of the project implementation time. The method was analyzed using Microsoft Excel and three scenarios were obtained for the duration of the project implementation, namely: the realization time obtained a duration of 126 calendar days, the time according to the number of workers at the location obtained a duration of 120 calendar days, and the time with the number of workers obtained a duration of 112 calendar days. Thus, the project implementation time was accelerated by 12 calendar days.

Copyrights © 2022






Journal Info

Abbrev

siartek

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Mechanical Engineering Transportation

Description

Jurnal Teknik Sipil dan Arsitektur adalah jurnal ilmu dan penerapan bidang Teknik Sipil dan Teknik Arsitektur yang terbit dua kali dalam setahun, pada bulan April dan Oktober sejak tahun 2015. Artikel dapat berupa produk penelitian, pemikiran ilmiah atau studi kasus, dalam teknik sipil dan ...