International Journal of Sustainable Building, Infrastructure and Environment
Vol 6, No 2 (2025)

Parking Analysis at Banyumanik 2 General Hospital, Semarang City

Khoir, Muhamad Walidul (Unknown)
Setiawan, Muhammad Agus (Unknown)
Suwandi, Putri Anggi Permata (Unknown)
Yudaningrum, Farida (Unknown)



Article Info

Publish Date
12 Jan 2026

Abstract

Vehicle movement will be hampered if the available parking space is insufficient to meet the needs of the facility itselfThe method taken in making this final assignment is to use quantitative methods.the total parking revenue in the Banyumanik 2 Hospital area, Semarang City at the time of the research, based on predetermined parking planning, resulted in an estimated parking levy of Rp. 888,000.00,- per 2 hours.This planning results in a total parking pattern of 46 cars and 153 motorcycles. total income during the research was IDR 668,000.00 per 2 hours. Based on parking planning during research with 46 car lots and 153 motorbikes, there is a total planned levy of IDR 888,000.00 per 2 hours.

Copyrights © 2025






Journal Info

Abbrev

ijosbie

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

International Journal of Sustainable Building, Infrastructure, and Environment (IJOSBIE) is a peer-reviewed open-access international scientific journal who aims to provide an international platform for researchers, professionals, lecturer, and educational practitioners on all topics related to ...