EVALUASI DIMENSI SETTLING POND 6 BLOK KEUNO PADA PT. BUKIT MAKMUR INSTINDO NIKELTAMA (BUMANIK) KECAMATAN PETASIA TIMUR KABUPATEN MOROWALI UTARA PROVINSI SULAWESI TENGAH

Supriandi (Universitas Pejuang Republik Indonesia)
Gina Audina P Alhabsyi (Teknik Pertambangan, Fakultas Teknik, Universitas Pejuang Republik Indonesia, Makassar)
Ruth Bunga R (Universitas Pejuang Republik Indonesia)



Article Info

Publish Date
29 Dec 2025

Abstract

The purpose of this study was to determine the dominance size of the settling pond, calculate the discharge and the runoff volume of the Keuno Block B Pit. The purpose of making this settling pond is to accommodate runoff water flow that will enter the mining area in Pit B of the Keuno Block. The research method used is descriptive research to provide information about facts and phenomena that occur at the research site. Data was collected through field observations, interviews, and document studies. Association obtained 1) Water entering the Pit B Block of Keuno in the form of runoff water with a discharge of 2,72 m3 / sec at DTH, 0,609 m3 / sec at DTH II, and 1,081 m3 / sec at DTH III 1,069 m3 / sec. 2) From the results of runoff discharge calculations, the dimensions of the first settling pond plan are made: Water Discharge (Q) = 2,72 m3 / sec, Pool Volume (V) = 1000 m3, Pool Length I ( P) = 35 m, Pool Length II (P) 30 m, Pool length III (P) 25 m. Pool side width I (L) = 24 m, Pool side width II (L) 22 m, Pool side width (L) = 20 m. Pool Depth (d) = 5 m.

Copyrights © 2025






Journal Info

Abbrev

JurnalFatekJM

Publisher

Subject

Engineering

Description

JTT: Journal Teknik Dan Teknologi : Berperan dalam merancang, menganalisis, dan memelihara sistem mekanik seperti alat berat, mesin bor, sistem transportasi tambang, dan peralatan produksi. Teknik Mesin memberikan dasar keteknikan untuk memastikan efisiensi kerja alat serta ketahanan terhadap ...