Analisis Perencanaan Waktu Pada Proyek Peningkatan Ruas Jalan Bulo-Bungin Di Kabupaten Enrekang

Saputra D, Muh Agung Dewa (Unknown)
Abduh, Natsir (Unknown)
Cangara, Satriawati (Unknown)



Article Info

Publish Date
30 Jan 2026

Abstract

This study examines the "Review of Time and Labor Schedule Planning for the Bulo-Bungin Road Improvement Project in Enrekang Regency" which has the aim of knowing the duration of time and how much optimal labor is needed or required in the Bulo-Bungin road improvement project in Enrekang Regency. This research uses quantitative research to analyze data obtained from project sites and related documentation. The analysis method used in this research is Critical Path Method (CPM). Where Critical Path Method (CPM) is used to prioritize project activities or activities. The results showed that using the Critical Path Method to plan the project's time and labor schedule was more effective, because the duration of the work time was 8 days faster than before using the s-curve says it takes 140 days.

Copyrights © 2026






Journal Info

Abbrev

jptsk

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Materials Science & Nanotechnology

Description

Fokus pada bidang ini antara lain perancangan/pelaksana pembangunan/pemeliharaan prasarana jalan, jembatan, terowongan, gedung, bandar udara, lalu lintas (darat, laut, udara), sistem jaringan kanal, drainase, irigasi, perumahan, gedung, minimalisasi kerugian gempa, perlindungan lingkungan, ...