Fundamental Management Journal
Vol. 11 No. 1 (2026): ISSN:2540 -9816 EDISI PRINT, APRIL 2026

ANALISIS RISIKO KECELAKAAN KERJA PEMASANGAN PRECAST FASADE PADA PROYEK ASPEN RESIDENCE (Studi Kasus Mahasiswa Fakultas Ekonomi dan Bisnis Universitas Kristen Indonesia)

Reygita Bintang Mutiara (Universitas Kristen Indonesia)
Poerwaningsih S. Legowo (Unknown)
Edison Siregar (Unknown)



Article Info

Publish Date
04 Apr 2026

Abstract

The Aspen Residence Tower D project is considered to have significant occupational risk due to the high complexity of the building, which consists of 23 floors and 2 basements (25 floors total), while Towers A, B, and C are already occupied. Construction activity near active residents increases the risk of work-related accidents. This research uses the OHSAS 18001:2007 standard for risk analysis, combining preliminary surveys and questionnaires to identify, assess, and prioritize risks. The Bowtie method is used to analyze major risks with moderate to extreme levels. The study found three risks in the "moderate" category (dust pollution, burns, UV exposure), seven in the "high" category (pinched hand, chain block injuries, pinched feet, scratches, electric shocks, eye injuries, gas exposure), and two in the "extreme" category (falling precast, worker falling from height). These extreme risks were analyzed in detail to determine causes, impacts, and controls. Keywords: Risk analysis, Occupational accident, Likelihood, Severity, Risk matrix, Bowtie method

Copyrights © 2026






Journal Info

Abbrev

jm

Publisher

Subject

Decision Sciences, Operations Research & Management

Description

The Fundamental Management Journal provides a valuable outlet for basic research on management and economic-orientated themes and topics. It publishes articles of a multi-disciplinary and interdisciplinary nature as well as empirical research from within traditional disciplines and managerial ...