Journal Industrial Manufacturing
Vol. 11 No. 1 (2026): Journal Industrial Manufacturing

Penerapan Metode Full Time Equivalent Untuk Mengukur Beban Kerja Pada Unit Tml-1 (Receiving Area) PT. GMF Aeroasia Tbk

Akbar Rizky Saputra (Unknown)
Ismail Fardiansyah (Universitas Muhammadiyah Tangerang)
Tri Widodo (Unknown)



Article Info

Publish Date
30 Jun 2026

Abstract

Human resource management (HRM) is one of the success factors of a company, because by implementing human resource management in a company it will provide an even distribution of workload and the number of workers in a company. Unit TML-1 is one of the units in PT. GMF Aeroasia which is tasked as a Receiving Area service, where in 2024 the unit has a high number of overtime. This study aims to calculate the workload, analyze and determine improvements in the workload conditions of the TML-1 unit using the Full Time Equivalent (FTE) method. Based on the analysis that has been carried out on 3 positions in the TML-1 unit, the senior officer position has a normal category, Officer 1 and 2 have a normal category, while the PKWT position has an overload category with an FTE value of 8.57. After getting the FTE value, the proposal given to the TML-1 unit is to increase the number of workers in the PKWT position by 5 people so that the workload category becomes normal. Keyword: workload analysis, full time equivalent, rating factor, lead time, human resource management.

Copyrights © 2026






Journal Info

Abbrev

jim

Publisher

Subject

Engineering Industrial & Manufacturing Engineering

Description

Journal of Industrial Manufacturing merupakan jurnal ilmiah yang berfokus terhadap continuous improvement dalam dunia industri (maufaktur dan jasa). Selain itu ruang lingkup jurnal mencakup seluruh keilmuan Teknik ...