ANALISA PERBANDINGAN EFISIENSI WAKTU DAN BIAYA UDITCH DAN BOX CULVERT UNTUK PENANGANAN SALURAN EXISTING

Rifqi Sahrul Nurhuda (Universitas Kadiri)
Eko Siswanto (Universitas Kadiri)
Faiz Muhammad Azhari (Universitas Kadiri)



Article Info

Publish Date
28 Dec 2025

Abstract

This study addresses the challenge of drainage construction in narrow, high-traffic locations along Slamet Riyadi Road, Kediri, through a comparative analysis of 266-meter precast U-Ditch and Box Culvert systems. The primary objective is to evaluate the cost and time efficiency of both systems using an integrated approach: (1) technical data collection from CV. Kembar Karya Consultant and PUPR Regulation No. 30/2025, (2) dimensional modeling using AutoCAD, and (3) simulation of the Budget Plan RAB and schedule using Microsoft Excel with S-curves. The results reveal three crucial findings: First, U-Ditch yields significant cost savings of 40% IDR 359,704,257 with a total budget of IDR 547,820,228 compared to Box Culvert's IDR 907,524,485. Second, U-Ditch's unit cost is only IDR 2,109,818/unit – 76% lower than Box Culvert's IDR 3,708,762/unit. Third, although Box Culvert installation commenced three weeks earlier, U-Ditch completed the main installation phase one week faster 4 weeks vs. 5 weeks with 18% higher peak productivity 60-70 units/week vs. 51-52 units/week. These savings enabled the reallocation of IDR 360,000,000 for high-quality sidewalk integration. The study confirms U-Ditch's superiority as the optimal solution for cost-time efficiency in urban infrastructure rehabilitation.

Copyrights © 2025






Journal Info

Abbrev

racic

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

RACIC "Rab Construction Research" (ISSN 2527-7073) adalah Jurnal yang dikelola oleh Program Studi Teknik Sipil, Fakultas Teknik Universitas Abdurrab, yang terbit secara berkala dalam dua edisi per ...