Identification of Human Resource Planning Factors in In-house Construction Management (Owner-Managed Construction) Affecting the Time Performance of Hotel Development Projects

Rahma Ghaesani Subagja (Magister of Civil Engineering Construction Management Program, Faculty of Engineering, Universitas Indonesia, Indonesiaia, rahma.ghaesani@ui.ac.id)
Rully Andhika Karim (Magister of Civil Engineering Construction Management Program, Faculty of Engineering, Universitas Indonesia, Indonesiaia, rahma.ghaesani@ui.ac.id)



Article Info

Publish Date
22 Jul 2026

Abstract

In projects implementing an In-house Construction Management (CM) system, the effectiveness of human resource (HR) planning is a critical aspect in supporting the achievement of project time targets, particularly in projects whose Owners lack a construction-related background. This condition is commonly found in Hotel Development Projects, as the Owner's core business is neither in the construction sector nor in hotel operations. Therefore, this study aims to analyze the HR planning factors of In-house CM in owner-managed construction with limited project management background, and to examine their influence on project time performance. The study employs a descriptive quantitative approach using a case study method. Data were obtained through a literature review, expert validation to determine the level of influence of indicators on time performance, and the distribution of questionnaires to project respondents to identify the existing conditions. Data analysis was conducted using the Relative Importance Index (RII) method, mean score, and the Spearman correlation test. The RII results identified 12 indicators categorized as "Very High" in importance, which were subsequently tested for their correlation with project time performance. The results indicate that HR mobilization time planning and the establishment of team coordination relationships have the strongest correlation (categorized as "Strong"), thus becoming the priority indicators in efforts to improve the time performance of Hotel Development Projects.

Copyrights © 2026






Journal Info

Abbrev

GIJES

Publisher

Subject

Aerospace Engineering Automotive Engineering Civil Engineering, Building, Construction & Architecture Electrical & Electronics Engineering Mechanical Engineering

Description

Greenation International Journal of Engineering Science (GIJES) is a peer-reviewed journal managed and published by Greenation Research & Yayasan Global Resarch National. GIJES is published four times a year, in March, June, September, and December. GIJES provides a platform for academics, ...