Jurnal Tugas Akhir Mahasiswa Lanting
Vol 15 No 1 (2026): JTAM LANTING Februari 2026

PUSKESMAS LANDASAN ULIN BERDASARKAN KLASTER INTEGRASI LAYANAN PRIMER (ILP)

Difa Najla Ufaira (Prodi Arsitektur Fakultas Teknik Universitas Lambung Mangkurat)
Prima Widia Wastuty (Prodi Arsitektur Fakultas Teknik Universitas Lambung Mangkurat)



Article Info

Publish Date
26 Jul 2026

Abstract

Landasan Ulin Community Health Center in Banjarbaru City requires reconstruction to accommodate a cluster-based health service system in accordance with the Minister of Health Decree Number 2015 of 2023 on Primary Health Service Integration. The architectural problem addressed is how to design a community health center that supports health service clusters based on life cycles by applying the wayfinding concept as a medium for direction coordination and spatial orientation through intuitive elements of zoning, color, materials, and signage. The design results in a building with five cluster zones (Management, Mother and Child, Adult and Elderly, Communicable Disease Control, and Cross-Cluster) featuring simple geometric forms with directed circulation, a wayfinding system through distinctive colors, informative signage, and accessible spatial arrangements. The design integrates functional, aesthetic, and comfort aspects while considering health building standards and strategic site conditions on Jalan A. Yani KM 23, thereby creating an efficient, inclusive, and easily accessible health service environment.

Copyrights © 2026






Journal Info

Abbrev

lanting

Publisher

Subject

Arts Humanities Civil Engineering, Building, Construction & Architecture Computer Science & IT Education Energy

Description

This journal is available to students who wish to improve their publication after the final project. Jurnal Tugas Akhir Mahasiswa Lanting is a journal of the graduate students final project which contains architecture design and design concepts offered as a solution to the problems raised in this ...