Jurnal Penelitian Progresif (JPP)
Vol 5 No 2 (2026): MARCH 2026 - AUGUST 2026

EVALUATION OF EARTH RETAINING WALL (TPT) PLANNING FOR THE KUTACANE CITY BOUNDARY NATIONAL ROAD PROJECT – BELANGKEJEREN KM 56 + 600 BELANGKEJEREN YEAR 2024

Harun Harasid (Gunung Leuser University)



Article Info

Publish Date
30 Aug 2026

Abstract

From the results of analysis and drilling tests with a machine drill , standard penetration test (SPT) and laboratory testing . The type of soil from the drilling results is clay , gravel & fine to coarse sand , medium stiffness / density to dense low to medium water content , non- plastic to low plastic , where solid soil has been found at a depth of 13 meters. The retaining wall structure (TPT) on the Kutacane - Belangkejeren KM 56 + 600 boundary road is safe against active pressure and pasaip pressure . The pile drill to hold the TPT from overturning or landslide forces used is round with a diameter of 40 cm , the length of the pile drill is 7.0 meters, and the area of ​​the pile drill circle is 1256 Gm2.

Copyrights © 2026






Journal Info

Abbrev

jpp

Publisher

Subject

Religion Humanities Economics, Econometrics & Finance Education Languange, Linguistic, Communication & Media Law, Crime, Criminology & Criminal Justice Public Health Social Sciences Other

Description

Kewajiban perkembangan ilmu pengetahuan yang harus dimanfaatkan langsung baik secara teoritis maupun empiris terbukti telah memberikan dampak positif dari berbagai aspek kehidupan masyarakat. Perkembangan ilmu di berbagai bidang banyak memberikan manfaat bagi peningkatan efektifitas dan efisiensi ...