Construction project work is a long process. During the implementation, various problems will inevitably be encountered. The most common problem is wasted materials. Waste materials are not only about wasted materials, but also wasted time and do not provide added value to the users of construction services. This study aims to provide answers to the factors causing material waste that are very dominant in the project to improve the quality of slum areas in Candikuning Village, Baturiti District, Tabanan Regency. This study ran for 7 (seven) days from July 29, 2025 to August 4, 2025. This study was carried out by distributing questionnaires to 32 contractor members who carried out the construction project in Candikuning. Data were analyzed using descriptive analysis through the results of the mean and standard deviation. This study provides answers to the most dominant factors in material waste in the project to improve the quality of slum areas in Candikuning Village, Baturiti District, Tabanan Regency. There are 3 (three) main factors that influence waste material, namely design changes (F5) where the mean score is 4.5 and the standard deviation is 0.57; waiting time for equipment repair (A3) with a mean of 4.44 and a standard deviation of 0.56; and complex image detailing (F4) with a value for the mean of 4.44 and a standard deviation of 0.67.
Copyrights © 2026