ANALISIS PENGUKURAN WAKTU KERJA UNTUK MENENTUKAN WAKTU BAKU PADA JALUR PRODUKSI BAJA H-BEAM

Rizky Aditya Sanjaya (Fakultas Teknik, Universitas Majalengka)
Lia Milana (Fakultas Teknik, Universitas Majalengka)



Article Info

Publish Date
01 Oct 2026

Abstract

This study was conducted to determine the standard time for producing steel H-Beam profiles measuring 250x270x16x18x4990 mm at PT Wika Industri dan Konstruksi, Steel Fabrication Plant Majalengka. The company runs a make to order production system, so no standard time has ever been set, which makes production scheduling and capacity planning difficult. The stopwatch time study method was applied through direct observation of twenty production units across six main work elements, starting from material setup, plate cutting, station transfer, fit up assembly, and final welding. The collected data were tested for uniformity and adequacy before being converted into normal time and standard time. Performance rating was determined using the Westinghouse system, while the allowance was determined based on the International Labour Organization recommendation. The result shows that the total average cycle time reached 96 minutes and 23 seconds. After applying a performance rating of 1.04 and an allowance ranging from 16 to 19 percent depending on the work element, the total standard time obtained was 119 minutes and 3 seconds. The cutting process on the AMG-12 machine was identified as the bottleneck of the production line, with a standard time of 68 minutes and 40 seconds, mainly caused by the plate thickness that limits the cutting speed. This condition creates an imbalance between the cutting station and the following stations, resulting in idle time at the assembly and welding stations. A projection was also conducted to estimate the potential reduction in total production time if the bottleneck at the AMG-12 machine were resolved through cutting parameter optimization or a change of cutting method. Based on a 15 to 30 percent reduction range reported in prior studies on metal fabrication efficiency, the simulation showed that the total production time for 20 units could be shortened by approximately 14.5 to 28.9 percent, depending on the improvement scenario applied. The standard time obtained from this study is expected to help the company plan production capacity, schedule customer orders, and improve the balance of workload across the production line.

Copyrights © 2026






Journal Info

Abbrev

stima

Publisher

Subject

Computer Science & IT Control & Systems Engineering Industrial & Manufacturing Engineering Mechanical Engineering Transportation

Description

Prosiding SEMINAR TEKNOLOGI MAJALENGKA (STIMA) adalah publikasi ilmiah yang memuat hasil-hasil penelitian orisinal dan terkini dari para akademisi, peneliti, dan praktisi di berbagai bidang teknik dan manajemen. Prosiding ini memiliki sifat multidisiplin, berfokus pada integrasi ilmu pengetahuan ...