Cement, as the main raw material, plays a critical role in ensuring the continuity of precast concrete production. This study examines the raw material inventory control policy applied by PT Wijaya Karya Beton Tbk, Concrete Product Plant (PPB) Majalengka, using the Economic Order Quantity (EOQ) method. Inventory data for 2025 indicate fluctuating cement requirements, with a total annual demand of 13,768,579 kg, while the company's actual ordering policy resulted in 44 orders per year and a total inventory cost of Rp15,482,636. This study aims to describe the actual inventory condition, determine the optimal order quantity using EOQ, and compare the total inventory cost of the actual policy with an EOQ-based policy. A quantitative descriptive method was applied using secondary data obtained directly from the company's Production Planning and Inventory Control (PPIC) staff. The results show that the optimal order quantity is 479,036 kg per order, with an order frequency of 29 times per year, a reorder point of 263,898 kg, and a total inventory cost of Rp5,548,442. The EOQ method reduces the total inventory cost by Rp9,734,194, or approximately 62,87%, compared with the company's actual policy, indicating that EOQ provides a more efficient and structured basis for cement inventory control at PT Wijaya Karya Beton Tbk PPB Majalengka.
Copyrights © 2026