The installation of a gondola system on high-rise buildings with glass facades, such as the BTN Regional Office I West Java Building, requires high precision, particularly in designing the curved track geometry and determining pedestal placement. This study aims to analyze the optimal geometry and distance between pedestals to ensure the stability and safety of the Building Maintenance Unit (BMU) rail system. The method used is a descriptive quantitative approach combining 3D survey mapping with AutoCAD simulation tools. The results show that the inner and outer curve track geometry were designed with radiuses of R1000 and R2800 using IWF 150x75 mm steel profiles. Based on 3D Cartesian coordinate calculations (X, Y, Z), an optimal pedestal spacing ($d$) of 1.5 meters was obtained from a 4.5-meter segment with 4 pedestal points. This precise positioning prevents wheel binding, ensures uniform load distribution, and optimizes material usage without compromising structural safety.
Copyrights © 2026