Existing government office buildings often have no record of green building performance, and the cost of improving it is rarely estimated. This study evaluated the green building performance of the Balai Besar Wilayah Sungai (BBWS) Sumatera II Medan office building at the utilization stage, identified the improvements needed to reach the lowest rating (Pratama), and estimated their cost. The assessment used the checklist of Minister of Public Works and Housing Regulation No. 21 of 2021 and Circular Letter No. 01/SE/M/2022, with field observation, interviews with the building management, and official documents. Costs were calculated as quantity multiplied by unit price, using the Medan unit price standard and the government e-catalogue. The building scored 15.92 of 165 points (9.65%) and did not reach any rating. Missing documents, written policies, and consumption monitoring were the main sources of lost points. Managerial improvements, together with technical modifications to air conditioners, sanitary fixtures, and waste bins, would raise the score to 76.32 points (46.25%), which meets the Pratama rating. The technical modifications were estimated at IDR 690,059,339, about 81% of which is air conditioner replacement. These results give the management a scored and costed basis for budget planning.
Copyrights © 2026